Cargando…
Beam Measurement Required in the first two years of LHC Commissioning
Autor principal: | Zimmermann, Frank |
---|---|
Lenguaje: | eng |
Publicado: |
2006
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/973366 |
Ejemplares similares
-
Strategy for First Two Months of LHC Beam Commissioning (Commissioning to First Stable Beams)
por: Redaelli, S, et al.
Publicado: (2015) -
Strategy for the first two months of the LHC beam commissioning and key early measurements
por: Redaelli, S, et al.
Publicado: (2014) -
Commissioning and First Performance of the LHC Beam Current Measurement Systems
por: Belohrad, D, et al.
Publicado: (2010) -
The Minimum Workable LHC: Plans and Requirements for Beam Commissioning in Years 1 and 2
por: Bailey, R
Publicado: (2006) -
Electrical Circuits Required for the Minimum Workable LHC during Commissioning and first two years of Operation
por: Giovannozzi, Massimo
Publicado: (2006)