Cargando…
Installation and testing of the 112 boards for the front-end electronics.
Installation and testing of the 112 boards for the front-end electronics. 28 boards are interconnected to a TPC type Readout Controller Unit trought the horizontal bus strips. The blue tubes are for the circulating cooling water.
Publicado: |
2006
|
---|---|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/975941 |
Sumario: | Installation and testing of the 112 boards for the front-end electronics. 28 boards are interconnected to a TPC type Readout Controller Unit trought the horizontal bus strips. The blue tubes are for the circulating cooling water. |
---|