Cargando…
The HERA turn around time
In the framework of the proposed LHC luminosity upgrade it is envisaged to increase the LHC injection energy. One benefit of this measure could be a decrease in the turn around time, i.e. the time between the end of a luminosity run and the beginning of the next run [1]. This paper will describe the...
Autor principal: | Bieler, M |
---|---|
Lenguaje: | eng |
Publicado: |
CERN
2006
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.5170/CERN-2006-008.125 http://cds.cern.ch/record/978348 |
Ejemplares similares
-
Monitoring Beam Quality at HERA
por: Bieler, M
Publicado: (2001) -
Operational Challenges of HERA's Superconducting Proton Machine
por: Bieler, M, et al.
Publicado: (2001) -
Turn-around improvements
por: Redaelli, Stefano, et al.
Publicado: (2012) -
How to improve turn-around
por: Redaelli, S
Publicado: (2010) -
Design of a High Power Synchrotron Radiation Absorber for HERA
por: Bieler, M, et al.
Publicado: (1999)