Cargando…
LEIR-PS Trajectory Measurement
The trajectory of the extracted ions from the Low Energy Ion Ring (LEIR) to the PS will have to be measured and stored every 3.6s. The existing LEAR Pick-ups (PUs) are re-used, but the front end electronics and acquisition system have been changed. This note addresses the requirements for the trajec...
Autores principales: | , |
---|---|
Lenguaje: | eng |
Publicado: |
2006
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/978583 |
Sumario: | The trajectory of the extracted ions from the Low Energy Ion Ring (LEIR) to the PS will have to be measured and stored every 3.6s. The existing LEAR Pick-ups (PUs) are re-used, but the front end electronics and acquisition system have been changed. This note addresses the requirements for the trajectory measurement, as well as the hardware and software, which has been developed and installed. |
---|