Cargando…
Lowering of a "dummy load" of around 400 tonnes into the CMS UXC55 underground cavern using the fixed gantry crane.
Autor principal: | |
---|---|
Publicado: |
2006
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/993669 |
_version_ | 1780911430458933248 |
---|---|
author | Nicolas Siegrist |
author_facet | Nicolas Siegrist |
author_sort | Nicolas Siegrist |
collection | CERN |
id | cern-993669 |
institution | Organización Europea para la Investigación Nuclear |
publishDate | 2006 |
record_format | invenio |
spelling | cern-9936692019-09-30T06:29:59Zhttp://cds.cern.ch/record/993669Nicolas SiegristLowering of a "dummy load" of around 400 tonnes into the CMS UXC55 underground cavern using the fixed gantry crane.OUTREACHCMS-PHO-OREACH-2006-026oai:cds.cern.ch:9936692006-10-26 |
spellingShingle | OUTREACH Nicolas Siegrist Lowering of a "dummy load" of around 400 tonnes into the CMS UXC55 underground cavern using the fixed gantry crane. |
title | Lowering of a "dummy load" of around 400 tonnes into the CMS UXC55 underground cavern using the fixed gantry crane. |
title_full | Lowering of a "dummy load" of around 400 tonnes into the CMS UXC55 underground cavern using the fixed gantry crane. |
title_fullStr | Lowering of a "dummy load" of around 400 tonnes into the CMS UXC55 underground cavern using the fixed gantry crane. |
title_full_unstemmed | Lowering of a "dummy load" of around 400 tonnes into the CMS UXC55 underground cavern using the fixed gantry crane. |
title_short | Lowering of a "dummy load" of around 400 tonnes into the CMS UXC55 underground cavern using the fixed gantry crane. |
title_sort | lowering of a "dummy load" of around 400 tonnes into the cms uxc55 underground cavern using the fixed gantry crane. |
topic | OUTREACH |
url | http://cds.cern.ch/record/993669 |
work_keys_str_mv | AT nicolassiegrist loweringofadummyloadofaround400tonnesintothecmsuxc55undergroundcavernusingthefixedgantrycrane |