Cargando…

Development and Fabrication of Nb$_3$Sn Rutherford Cable for the 11 T DS Dipole Demonstration Model

Fermilab and CERN started the development of 11 T Nb$_3$Sn dipoles 11 m long to replace a few regular LHC NbTi dipoles and free space for cold collimators in LHC dispersion suppression (DS) areas. An important step in the design of these magnets is the development of the high aspect ratio Nb$_3$Sn c...

Descripción completa

Detalles Bibliográficos
Autores principales: Barzi, E, Lombardo, V, Nobrega, F, Turrioni, D, Yamada, R, Zlobin, A V, Karppinen, M
Lenguaje:eng
Publicado: 2012
Materias:
Acceso en línea:https://dx.doi.org/10.1109/TASC.2011.2180869
http://cds.cern.ch/record/2773719
_version_ 1780971623811121152
author Barzi, E
Lombardo, V
Nobrega, F
Turrioni, D
Yamada, R
Zlobin, A V
Karppinen, M
author_facet Barzi, E
Lombardo, V
Nobrega, F
Turrioni, D
Yamada, R
Zlobin, A V
Karppinen, M
author_sort Barzi, E
collection CERN
description Fermilab and CERN started the development of 11 T Nb$_3$Sn dipoles 11 m long to replace a few regular LHC NbTi dipoles and free space for cold collimators in LHC dispersion suppression (DS) areas. An important step in the design of these magnets is the development of the high aspect ratio Nb$_3$Sn cable to achieve the nominal field of 11 T at the nominal LHC operating current of 11.85 kA with 20% margin. Keystoned cables 14.7 mm wide with and without a stainless steel core were made out of hard Cu wires and Nb$_3$Sn strand of 0.7 mm nominal diameter. The cable optimization process was aimed at achieving both mechanical stability and minimal damage to the internal architecture of the Restacked-Rod Process (RRP) Nb$_3$Sn strands with 127 restack design to be used in the magnet short models. Each cable was characterized electrically for transport properties degradation at high fields, for flux jump stability at low fields, and metallographically for internal damage.
id oai-inspirehep.net-1081725
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2012
record_format invenio
spelling oai-inspirehep.net-10817252021-10-04T14:09:59Zdoi:10.1109/TASC.2011.2180869http://cds.cern.ch/record/2773719engBarzi, ELombardo, VNobrega, FTurrioni, DYamada, RZlobin, A VKarppinen, MDevelopment and Fabrication of Nb$_3$Sn Rutherford Cable for the 11 T DS Dipole Demonstration ModelAccelerators and Storage RingsFermilab and CERN started the development of 11 T Nb$_3$Sn dipoles 11 m long to replace a few regular LHC NbTi dipoles and free space for cold collimators in LHC dispersion suppression (DS) areas. An important step in the design of these magnets is the development of the high aspect ratio Nb$_3$Sn cable to achieve the nominal field of 11 T at the nominal LHC operating current of 11.85 kA with 20% margin. Keystoned cables 14.7 mm wide with and without a stainless steel core were made out of hard Cu wires and Nb$_3$Sn strand of 0.7 mm nominal diameter. The cable optimization process was aimed at achieving both mechanical stability and minimal damage to the internal architecture of the Restacked-Rod Process (RRP) Nb$_3$Sn strands with 127 restack design to be used in the magnet short models. Each cable was characterized electrically for transport properties degradation at high fields, for flux jump stability at low fields, and metallographically for internal damage.FERMILAB-CONF-11-431-TDoai:inspirehep.net:10817252012
spellingShingle Accelerators and Storage Rings
Barzi, E
Lombardo, V
Nobrega, F
Turrioni, D
Yamada, R
Zlobin, A V
Karppinen, M
Development and Fabrication of Nb$_3$Sn Rutherford Cable for the 11 T DS Dipole Demonstration Model
title Development and Fabrication of Nb$_3$Sn Rutherford Cable for the 11 T DS Dipole Demonstration Model
title_full Development and Fabrication of Nb$_3$Sn Rutherford Cable for the 11 T DS Dipole Demonstration Model
title_fullStr Development and Fabrication of Nb$_3$Sn Rutherford Cable for the 11 T DS Dipole Demonstration Model
title_full_unstemmed Development and Fabrication of Nb$_3$Sn Rutherford Cable for the 11 T DS Dipole Demonstration Model
title_short Development and Fabrication of Nb$_3$Sn Rutherford Cable for the 11 T DS Dipole Demonstration Model
title_sort development and fabrication of nb$_3$sn rutherford cable for the 11 t ds dipole demonstration model
topic Accelerators and Storage Rings
url https://dx.doi.org/10.1109/TASC.2011.2180869
http://cds.cern.ch/record/2773719
work_keys_str_mv AT barzie developmentandfabricationofnb3snrutherfordcableforthe11tdsdipoledemonstrationmodel
AT lombardov developmentandfabricationofnb3snrutherfordcableforthe11tdsdipoledemonstrationmodel
AT nobregaf developmentandfabricationofnb3snrutherfordcableforthe11tdsdipoledemonstrationmodel
AT turrionid developmentandfabricationofnb3snrutherfordcableforthe11tdsdipoledemonstrationmodel
AT yamadar developmentandfabricationofnb3snrutherfordcableforthe11tdsdipoledemonstrationmodel
AT zlobinav developmentandfabricationofnb3snrutherfordcableforthe11tdsdipoledemonstrationmodel
AT karppinenm developmentandfabricationofnb3snrutherfordcableforthe11tdsdipoledemonstrationmodel