Welding and Quality Control for the Consolidation of the LHC Superconducting Magnets and Circuits

The first LHC long shutdown was driven by the need to consolidate the 13 kA splices between the superconducting magnets to safely attain its center of mass design energy of 14 TeV. Access to the splices requires the opening of welded sleeves by machining. After consolidation, the sleeves are re-weld...

Descripción completa

Detalles Bibliográficos
Autores principales: Atieh, Said, Bernardini, Marzia, Bertinelli, Francesco, Cruikshank, Paul, Dalin, Jean-Michel, Favre, Gilles, Kain, Verena, Lombard, Didier, Perin, Antonio, Pojer, Mirko, Rasul, Ghulam, Rey, David, Rizwan, Rashid, Savary, Frederic, Tock, Jean-Philippe
Lenguaje:eng
Publicado: 2014
Materias:
Acceso en línea:http://cds.cern.ch/record/2003174
_version_ 1780946189550616576
author Atieh, Said
Bernardini, Marzia
Bertinelli, Francesco
Cruikshank, Paul
Dalin, Jean-Michel
Favre, Gilles
Kain, Verena
Lombard, Didier
Perin, Antonio
Pojer, Mirko
Rasul, Ghulam
Rey, David
Rizwan, Rashid
Savary, Frederic
Tock, Jean-Philippe
author_facet Atieh, Said
Bernardini, Marzia
Bertinelli, Francesco
Cruikshank, Paul
Dalin, Jean-Michel
Favre, Gilles
Kain, Verena
Lombard, Didier
Perin, Antonio
Pojer, Mirko
Rasul, Ghulam
Rey, David
Rizwan, Rashid
Savary, Frederic
Tock, Jean-Philippe
author_sort Atieh, Said
collection CERN
description The first LHC long shutdown was driven by the need to consolidate the 13 kA splices between the superconducting magnets to safely attain its center of mass design energy of 14 TeV. Access to the splices requires the opening of welded sleeves by machining. After consolidation, the sleeves are re-welded using a TIG orbital welding. The welding process has been modified from the original “as-new” installation in order to better adapt to the “as repaired” situation. The intervention has been thoroughly prepared through qualifications, organisation of teams, their training and follow-up. Quality control is based on the qualification of equipment, process and operators; the recording of production parameters; regular process audits and production witness samples; visual inspection through an official certifying body. The paper also describes welding and quality control of special intervention cases, with issues of difficult access requiring innovative solutions. This work concerns over 10 000 welds and a team of 40 engineers and technicians over a period of 18 months. The experience and lessons learnt will be applicable to similar large complex projects.
id oai-inspirehep.net-1314493
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2014
record_format invenio
spelling oai-inspirehep.net-13144932022-08-17T13:30:40Zhttp://cds.cern.ch/record/2003174engAtieh, SaidBernardini, MarziaBertinelli, FrancescoCruikshank, PaulDalin, Jean-MichelFavre, GillesKain, VerenaLombard, DidierPerin, AntonioPojer, MirkoRasul, GhulamRey, DavidRizwan, RashidSavary, FredericTock, Jean-PhilippeWelding and Quality Control for the Consolidation of the LHC Superconducting Magnets and CircuitsAccelerators and Storage RingsThe first LHC long shutdown was driven by the need to consolidate the 13 kA splices between the superconducting magnets to safely attain its center of mass design energy of 14 TeV. Access to the splices requires the opening of welded sleeves by machining. After consolidation, the sleeves are re-welded using a TIG orbital welding. The welding process has been modified from the original “as-new” installation in order to better adapt to the “as repaired” situation. The intervention has been thoroughly prepared through qualifications, organisation of teams, their training and follow-up. Quality control is based on the qualification of equipment, process and operators; the recording of production parameters; regular process audits and production witness samples; visual inspection through an official certifying body. The paper also describes welding and quality control of special intervention cases, with issues of difficult access requiring innovative solutions. This work concerns over 10 000 welds and a team of 40 engineers and technicians over a period of 18 months. The experience and lessons learnt will be applicable to similar large complex projects.oai:inspirehep.net:13144932014
spellingShingle Accelerators and Storage Rings
Atieh, Said
Bernardini, Marzia
Bertinelli, Francesco
Cruikshank, Paul
Dalin, Jean-Michel
Favre, Gilles
Kain, Verena
Lombard, Didier
Perin, Antonio
Pojer, Mirko
Rasul, Ghulam
Rey, David
Rizwan, Rashid
Savary, Frederic
Tock, Jean-Philippe
Welding and Quality Control for the Consolidation of the LHC Superconducting Magnets and Circuits
title Welding and Quality Control for the Consolidation of the LHC Superconducting Magnets and Circuits
title_full Welding and Quality Control for the Consolidation of the LHC Superconducting Magnets and Circuits
title_fullStr Welding and Quality Control for the Consolidation of the LHC Superconducting Magnets and Circuits
title_full_unstemmed Welding and Quality Control for the Consolidation of the LHC Superconducting Magnets and Circuits
title_short Welding and Quality Control for the Consolidation of the LHC Superconducting Magnets and Circuits
title_sort welding and quality control for the consolidation of the lhc superconducting magnets and circuits
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/2003174
work_keys_str_mv AT atiehsaid weldingandqualitycontrolfortheconsolidationofthelhcsuperconductingmagnetsandcircuits
AT bernardinimarzia weldingandqualitycontrolfortheconsolidationofthelhcsuperconductingmagnetsandcircuits
AT bertinellifrancesco weldingandqualitycontrolfortheconsolidationofthelhcsuperconductingmagnetsandcircuits
AT cruikshankpaul weldingandqualitycontrolfortheconsolidationofthelhcsuperconductingmagnetsandcircuits
AT dalinjeanmichel weldingandqualitycontrolfortheconsolidationofthelhcsuperconductingmagnetsandcircuits
AT favregilles weldingandqualitycontrolfortheconsolidationofthelhcsuperconductingmagnetsandcircuits
AT kainverena weldingandqualitycontrolfortheconsolidationofthelhcsuperconductingmagnetsandcircuits
AT lombarddidier weldingandqualitycontrolfortheconsolidationofthelhcsuperconductingmagnetsandcircuits
AT perinantonio weldingandqualitycontrolfortheconsolidationofthelhcsuperconductingmagnetsandcircuits
AT pojermirko weldingandqualitycontrolfortheconsolidationofthelhcsuperconductingmagnetsandcircuits
AT rasulghulam weldingandqualitycontrolfortheconsolidationofthelhcsuperconductingmagnetsandcircuits
AT reydavid weldingandqualitycontrolfortheconsolidationofthelhcsuperconductingmagnetsandcircuits
AT rizwanrashid weldingandqualitycontrolfortheconsolidationofthelhcsuperconductingmagnetsandcircuits
AT savaryfrederic weldingandqualitycontrolfortheconsolidationofthelhcsuperconductingmagnetsandcircuits
AT tockjeanphilippe weldingandqualitycontrolfortheconsolidationofthelhcsuperconductingmagnetsandcircuits