Cargando…

CMS RPC commissioning of the existing detector during the long shutdown

February 1 (th) 2013 marked the end of the first period of running of the Large Hadron Collider (LHC) and the start of a two-year break from operation (LS1) aimed at consolidating both the accelerator as well as the detectors. By the end of LS1, the LHC is expected to provide collisions at 13 Tev. W...

Descripción completa

Detalles Bibliográficos
Autores principales: Cimmino, A, Ban, Y, Cai, J, Li, Q, Liu, S, Qian, S, Wang, D, Xu, Z, Zhang, F, Choi, Y, Kim, D, Goh, J, Choi, S, Hong, B, Kang, J W, Kang, M, Kwon, J H, Lee, K S, Lee, S K, Park, S K, Pant, L M, Mohanty, A K, Chudasama, R, Singh, J B, Bhatnagar, V, Mehta, A, Kumar, R, Cauwenbergh, S, Costantini, S, Crucy, S, Fagot, A, Garcia, G, Ocampo, A, Poyraz, D, Salva, S, Thyssen, F, Tytgat, M, Zaganidis, N, Doninck, W V, Cabrera, A, Chaparro, L, Gomez, J P, Gomez, B, Sanabria, J C, Avila, C, Ahmad, A, Muhammad, S, Shoaib, M, Hoorani, H, Awan, I, Ali, I, Ahmed, W, Asghar, M I, Shahzad, H, Sayed, A, Ibrahim, A, Aly, S, Assran, Y, Radi, A, Elkafrawy, T, Sharma, A, Colafranceschi, S, Abbrescia, M, Calabria, C, Colaleo, A, Iaselli, G, Loddo, F, Maggi, M, Nuzzo, S, Pugliese, G, Radogna, R, Venditti, R, Verwillingen, P, Benussi, L, Bianco, S, Piccolo, D, Paolucci, P, Buontempo, S, Cavallo, N, Merola, M, Fabozzi, F, Iorio, O M, Braghieri, A, Montagna, P, Riccardi, C, Salvini, P, Vitulo, P, Vai, I, Magnani, A, Dimitrov, A, Litov, L, Pavlov, B, Petkov, P, Aleksandrov, A, Genchev, V, Iaydjiev, P, Rodozov, M, Sultanov, G, Vutova, M, Stoykova, S, Hadjiiska, R, Ibargüen, H S, Morales, M I P, Bernardino, S C, Bagaturia, I, Tsamalaidze, Z, Crotty, I, Kim, M S
Lenguaje:eng
Publicado: 2014
Materias:
Acceso en línea:https://dx.doi.org/10.1088/1748-0221/9/10/C10043
http://cds.cern.ch/record/2025828

Ejemplares similares