Cargando…
NEG Thin Film Coating Development for the MAX IV Vacuum System
The new synchrotron radiation facility of the MAX IV laboratories is under construction and expected to deliver the first light beam in 2016. To cope with the small aperture, the intense photon bombardment and the low-pressure requirement, most of the beam pipes for the 3-GeV ring are going to be co...
Autores principales: | Grabski, Marek, Ahlbäck, Jonny, Al-Dmour, Eshraq, Fernandes Tavares, Pedro, Calatroni, Sergio, Chiggiato, Paolo, Costa Pinto, Pedro, Taborelli, Mauro |
---|---|
Lenguaje: | eng |
Publicado: |
2013
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2010143 |
Ejemplares similares
-
Diffraction-limited storage-ring vacuum technology
por: Al-Dmour, Eshraq, et al.
Publicado: (2014) -
Development and Production of Non-evaporable Getter Coatings for MAX IV
por: Costa Pinto, Pedro, et al.
Publicado: (2015) -
Commissioning and operation status of the MAX IV 3 GeV storage ring vacuum system
por: Grabski, Marek, et al.
Publicado: (2021) -
Synchrotron Radiation-Induced Desorption from a NEG-Coated Vacuum Chamber
por: Chiggiato, P, et al.
Publicado: (1999) -
Synchrotron radiation-induced desorption from a NEG-coated vacuum chamber [of ESRF beamline]
por: Chiggiato, P, et al.
Publicado: (2001)