Failure analysis and lessons learned on LHC experiments crate and power supply equipment

The LHC accelerator's first long shutdown period (LS1), in 2013–2014, has given the experiments the opportunity to perform planned upgrade and maintenance activities on systems and equipment. It has also been the right time to conduct a preventive maintenance campaign on crate and power supply...

Descripción completa

Detalles Bibliográficos
Autores principales: Bobillier, V, Mico, S
Lenguaje:eng
Publicado: 2015
Materias:
Acceso en línea:https://dx.doi.org/10.1088/1748-0221/10/02/C02038
http://cds.cern.ch/record/2158952
_version_ 1780950801818058752
author Bobillier, V
Mico, S
author_facet Bobillier, V
Mico, S
author_sort Bobillier, V
collection CERN
description The LHC accelerator's first long shutdown period (LS1), in 2013–2014, has given the experiments the opportunity to perform planned upgrade and maintenance activities on systems and equipment. It has also been the right time to conduct a preventive maintenance campaign on crate and power supply equipment which is foreseen to operate smoothly for another 4 to 8 years. This paper presents the lessons learned during the LS1 power supply preventive maintenance activities as well as an in-depth analysis of the most common failure modes and weaknesses encountered on the power supplies in the LHC experiments over the past years of operation.
id oai-inspirehep.net-1346792
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2015
record_format invenio
spelling oai-inspirehep.net-13467922019-09-30T06:29:59Zdoi:10.1088/1748-0221/10/02/C02038http://cds.cern.ch/record/2158952engBobillier, VMico, SFailure analysis and lessons learned on LHC experiments crate and power supply equipmentDetectors and Experimental TechniquesThe LHC accelerator's first long shutdown period (LS1), in 2013–2014, has given the experiments the opportunity to perform planned upgrade and maintenance activities on systems and equipment. It has also been the right time to conduct a preventive maintenance campaign on crate and power supply equipment which is foreseen to operate smoothly for another 4 to 8 years. This paper presents the lessons learned during the LS1 power supply preventive maintenance activities as well as an in-depth analysis of the most common failure modes and weaknesses encountered on the power supplies in the LHC experiments over the past years of operation.oai:inspirehep.net:13467922015
spellingShingle Detectors and Experimental Techniques
Bobillier, V
Mico, S
Failure analysis and lessons learned on LHC experiments crate and power supply equipment
title Failure analysis and lessons learned on LHC experiments crate and power supply equipment
title_full Failure analysis and lessons learned on LHC experiments crate and power supply equipment
title_fullStr Failure analysis and lessons learned on LHC experiments crate and power supply equipment
title_full_unstemmed Failure analysis and lessons learned on LHC experiments crate and power supply equipment
title_short Failure analysis and lessons learned on LHC experiments crate and power supply equipment
title_sort failure analysis and lessons learned on lhc experiments crate and power supply equipment
topic Detectors and Experimental Techniques
url https://dx.doi.org/10.1088/1748-0221/10/02/C02038
http://cds.cern.ch/record/2158952
work_keys_str_mv AT bobillierv failureanalysisandlessonslearnedonlhcexperimentscrateandpowersupplyequipment
AT micos failureanalysisandlessonslearnedonlhcexperimentscrateandpowersupplyequipment