Cargando…
Failure analysis and lessons learned on LHC experiments crate and power supply equipment
The LHC accelerator's first long shutdown period (LS1), in 2013–2014, has given the experiments the opportunity to perform planned upgrade and maintenance activities on systems and equipment. It has also been the right time to conduct a preventive maintenance campaign on crate and power supply...
Autores principales: | Bobillier, V, Mico, S |
---|---|
Lenguaje: | eng |
Publicado: |
2015
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1088/1748-0221/10/02/C02038 http://cds.cern.ch/record/2158952 |
Ejemplares similares
-
MicroTCA and AdvancedTCA equipment evaluation and developments for LHC experiments
por: Bobillier, V, et al.
Publicado: (2016) -
MicroTCA and AdvancedTCA equipment evaluation and customization for LHC experiments
por: Cosmo, M Di, et al.
Publicado: (2015) -
Evaluation results of xTCA equipment for HEP experiments at CERN
por: Di Cosmo, M, et al.
Publicado: (2013) -
Mobile Test Bench for the LHC Cryogenic Instrumentation Crate Commissioning
por: Avramidou, R M, et al.
Publicado: (2008) -
Low voltage powering of on-detector electronics for HL-LHC experiments upgrades
por: Bobillier, Vincent, et al.
Publicado: (2018)