Cargando…

The Phase-1 upgrade of the CMS silicon pixel detector

The present CMS pixel detector will be replaced in the shutdown period 2016/17 by an upgraded version due to the following reasons: increased luminosity at reduced bunch spacing ( from 7 x 10 33 cm - 2 s - 1 at 50 ns bunch spacing to 2 x 10 34 cm - 2 s - 1 at 25 ns bunch spacing) in the LHC , and ra...

Descripción completa

Detalles Bibliográficos
Autor principal: Menichelli, Mauro
Lenguaje:eng
Publicado: SISSA 2015
Materias:
Acceso en línea:https://dx.doi.org/10.22323/1.189.0011
http://cds.cern.ch/record/2158976