Cargando…
Design, construction and commissioning of a 15 kW CO$_2$ evaporative cooling system for particle physics detectors: lessons learnt and perspectives for further development
Autores principales: | Tropea, Paola, Daguin, Jerome, D'auria, Andrea, Godlewski, Jan, Ostrega, Maciej, Pavis, Steven, Petagna, Paolo, Postema, Hans, Zwalinski, Lukasz, Noite, Joao, Verlaat, Bart |
---|---|
Lenguaje: | eng |
Publicado: |
SISSA
2014
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.22323/1.213.0223 http://cds.cern.ch/record/2025942 |
Ejemplares similares
-
The Control System for the CO2 Cooling Plants for Physics Experiments
por: Zwalinski, L, et al.
Publicado: (2014) -
Development, commissioning and operation of the large scale CO$_2$ detector cooling systems for CMS pixel phase I upgrade
por: Ostrega, Maciej, et al.
Publicado: (2018) -
CO$_2$ cooling for particle detectors: experiences from the CMS and ATLAS detector systems at the LHC, and prospects for future upgrades
por: Bortolin, C, et al.
Publicado: (2015) -
CO$_2$ evaporative cooling: The future for tracking detector thermal management
por: Tropea, Paola, et al.
Publicado: (2015) -
Advancements and plans for the LHC upgrade detector thermal management with CO2 evaporative cooling
por: Tropea, P, et al.
Publicado: (2019)