Commissioning of the CERN LINAC4 Wire Scanner, Wire Grid and Slit-Grid Monitors at 3 and 12 MeV

The CERN LINAC4 has been commissioned up to 12 MeV. The H^{−} beam transverse profile distributions were measured by both wire grids and wire scanners. A slit-grid system located on a temporary diagnostics bench was used to characterize the transverse emittance during the two different stages of com...

Descripción completa

Detalles Bibliográficos
Autores principales: Roncarolo, Federico, Raich, Uli, Zocca, Francesca
Lenguaje:eng
Publicado: 2014
Materias:
Acceso en línea:http://cds.cern.ch/record/2062599
_version_ 1780948553663774720
author Roncarolo, Federico
Raich, Uli
Zocca, Francesca
author_facet Roncarolo, Federico
Raich, Uli
Zocca, Francesca
author_sort Roncarolo, Federico
collection CERN
description The CERN LINAC4 has been commissioned up to 12 MeV. The H^{−} beam transverse profile distributions were measured by both wire grids and wire scanners. A slit-grid system located on a temporary diagnostics bench was used to characterize the transverse emittance during the two different stages of commissioning: at the exit of the RFQ (3 MeV) and DTL1 (12 MeV). The wire signal is a balance between the negative charge deposited by the stripped electrons from the H^{−} and the charge lost due to secondary emission. Optimal settings were found for the repelling plates used to suppress secondary emission, which were confirmed by electromagnetic simulations. In addition, suppression of the secondary emission due to the beam space charge was observed. The benefit of changing the wire scanner geometry in order to minimize the cross-talk between horizontal and vertical wires and the observation of thermionic emission on carbon wires are also discussed.
id oai-inspirehep.net-1363439
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2014
record_format invenio
spelling oai-inspirehep.net-13634392019-09-30T06:29:59Zhttp://cds.cern.ch/record/2062599engRoncarolo, FedericoRaich, UliZocca, FrancescaCommissioning of the CERN LINAC4 Wire Scanner, Wire Grid and Slit-Grid Monitors at 3 and 12 MeVAccelerators and Storage RingsThe CERN LINAC4 has been commissioned up to 12 MeV. The H^{−} beam transverse profile distributions were measured by both wire grids and wire scanners. A slit-grid system located on a temporary diagnostics bench was used to characterize the transverse emittance during the two different stages of commissioning: at the exit of the RFQ (3 MeV) and DTL1 (12 MeV). The wire signal is a balance between the negative charge deposited by the stripped electrons from the H^{−} and the charge lost due to secondary emission. Optimal settings were found for the repelling plates used to suppress secondary emission, which were confirmed by electromagnetic simulations. In addition, suppression of the secondary emission due to the beam space charge was observed. The benefit of changing the wire scanner geometry in order to minimize the cross-talk between horizontal and vertical wires and the observation of thermionic emission on carbon wires are also discussed.CERN-ACC-2014-385oai:inspirehep.net:13634392014
spellingShingle Accelerators and Storage Rings
Roncarolo, Federico
Raich, Uli
Zocca, Francesca
Commissioning of the CERN LINAC4 Wire Scanner, Wire Grid and Slit-Grid Monitors at 3 and 12 MeV
title Commissioning of the CERN LINAC4 Wire Scanner, Wire Grid and Slit-Grid Monitors at 3 and 12 MeV
title_full Commissioning of the CERN LINAC4 Wire Scanner, Wire Grid and Slit-Grid Monitors at 3 and 12 MeV
title_fullStr Commissioning of the CERN LINAC4 Wire Scanner, Wire Grid and Slit-Grid Monitors at 3 and 12 MeV
title_full_unstemmed Commissioning of the CERN LINAC4 Wire Scanner, Wire Grid and Slit-Grid Monitors at 3 and 12 MeV
title_short Commissioning of the CERN LINAC4 Wire Scanner, Wire Grid and Slit-Grid Monitors at 3 and 12 MeV
title_sort commissioning of the cern linac4 wire scanner, wire grid and slit-grid monitors at 3 and 12 mev
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/2062599
work_keys_str_mv AT roncarolofederico commissioningofthecernlinac4wirescannerwiregridandslitgridmonitorsat3and12mev
AT raichuli commissioningofthecernlinac4wirescannerwiregridandslitgridmonitorsat3and12mev
AT zoccafrancesca commissioningofthecernlinac4wirescannerwiregridandslitgridmonitorsat3and12mev