Cargando…
Commissioning of the CERN LINAC4 Wire Scanner, Wire Grid and Slit-Grid Monitors at 3 and 12 MeV
The CERN LINAC4 has been commissioned up to 12 MeV. The H^{−} beam transverse profile distributions were measured by both wire grids and wire scanners. A slit-grid system located on a temporary diagnostics bench was used to characterize the transverse emittance during the two different stages of com...
Autores principales: | , , |
---|---|
Lenguaje: | eng |
Publicado: |
2014
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2062599 |
_version_ | 1780948553663774720 |
---|---|
author | Roncarolo, Federico Raich, Uli Zocca, Francesca |
author_facet | Roncarolo, Federico Raich, Uli Zocca, Francesca |
author_sort | Roncarolo, Federico |
collection | CERN |
description | The CERN LINAC4 has been commissioned up to 12 MeV. The H^{−} beam transverse profile distributions were measured by both wire grids and wire scanners. A slit-grid system located on a temporary diagnostics bench was used to characterize the transverse emittance during the two different stages of commissioning: at the exit of the RFQ (3 MeV) and DTL1 (12 MeV). The wire signal is a balance between the negative charge deposited by the stripped electrons from the H^{−} and the charge lost due to secondary emission. Optimal settings were found for the repelling plates used to suppress secondary emission, which were confirmed by electromagnetic simulations. In addition, suppression of the secondary emission due to the beam space charge was observed. The benefit of changing the wire scanner geometry in order to minimize the cross-talk between horizontal and vertical wires and the observation of thermionic emission on carbon wires are also discussed. |
id | oai-inspirehep.net-1363439 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2014 |
record_format | invenio |
spelling | oai-inspirehep.net-13634392019-09-30T06:29:59Zhttp://cds.cern.ch/record/2062599engRoncarolo, FedericoRaich, UliZocca, FrancescaCommissioning of the CERN LINAC4 Wire Scanner, Wire Grid and Slit-Grid Monitors at 3 and 12 MeVAccelerators and Storage RingsThe CERN LINAC4 has been commissioned up to 12 MeV. The H^{−} beam transverse profile distributions were measured by both wire grids and wire scanners. A slit-grid system located on a temporary diagnostics bench was used to characterize the transverse emittance during the two different stages of commissioning: at the exit of the RFQ (3 MeV) and DTL1 (12 MeV). The wire signal is a balance between the negative charge deposited by the stripped electrons from the H^{−} and the charge lost due to secondary emission. Optimal settings were found for the repelling plates used to suppress secondary emission, which were confirmed by electromagnetic simulations. In addition, suppression of the secondary emission due to the beam space charge was observed. The benefit of changing the wire scanner geometry in order to minimize the cross-talk between horizontal and vertical wires and the observation of thermionic emission on carbon wires are also discussed.CERN-ACC-2014-385oai:inspirehep.net:13634392014 |
spellingShingle | Accelerators and Storage Rings Roncarolo, Federico Raich, Uli Zocca, Francesca Commissioning of the CERN LINAC4 Wire Scanner, Wire Grid and Slit-Grid Monitors at 3 and 12 MeV |
title | Commissioning of the CERN LINAC4 Wire Scanner, Wire Grid and Slit-Grid Monitors at 3 and 12 MeV |
title_full | Commissioning of the CERN LINAC4 Wire Scanner, Wire Grid and Slit-Grid Monitors at 3 and 12 MeV |
title_fullStr | Commissioning of the CERN LINAC4 Wire Scanner, Wire Grid and Slit-Grid Monitors at 3 and 12 MeV |
title_full_unstemmed | Commissioning of the CERN LINAC4 Wire Scanner, Wire Grid and Slit-Grid Monitors at 3 and 12 MeV |
title_short | Commissioning of the CERN LINAC4 Wire Scanner, Wire Grid and Slit-Grid Monitors at 3 and 12 MeV |
title_sort | commissioning of the cern linac4 wire scanner, wire grid and slit-grid monitors at 3 and 12 mev |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/2062599 |
work_keys_str_mv | AT roncarolofederico commissioningofthecernlinac4wirescannerwiregridandslitgridmonitorsat3and12mev AT raichuli commissioningofthecernlinac4wirescannerwiregridandslitgridmonitorsat3and12mev AT zoccafrancesca commissioningofthecernlinac4wirescannerwiregridandslitgridmonitorsat3and12mev |