Lataa…

Transverse Profile and Emittance Measurements With a Laser Stripping System During the CERN LINAC4 Commissioning at 3 and 12 MeV

The CERN LINAC4 beam commissioning at 3 and 12 MeV was completed in 2014. A novel system for measuring the transverse beam profile and emittance, based on low power laser stripping and H⁰ detection using a diamond detector, was successfully tested at these two energies. The measurement results agree...

Täydet tiedot

Bibliografiset tiedot
Päätekijät: Roncarolo, Federico, Bravin, Enrico, Hofmann, Thomas, Raich, Uli, Zocca, Francesca, Boorman, Gary, Bosco, Alessio, Gibson, Stephen, Kruchinin, Konstantin, Gabor, Christoph, Pozimski, Jürgen
Kieli:eng
Julkaistu: 2014
Aiheet:
Linkit:http://cds.cern.ch/record/2062600