Commissioning of the Linac4 Low Level RF and Future Plans
Linac4 is a new 86-m long normal-conducting linear accelerator that will provide 160 MeV H^{−} to the CERN PS Booster (PSB), and replace the present 50 MeV proton Linac2. The Low Level RF (LLRF) system has to control the RFQ, two choppers, three bunching cavities, twenty two accelerating cavities an...
Autores principales: | , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2014
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2062609 |
_version_ | 1780948555810209792 |
---|---|
author | Baudrenghien, Philippe Galindo, Javier Hagmann, Gregoire Noirjean, Jose Stellfeld, Donat Valuch, Daniel |
author_facet | Baudrenghien, Philippe Galindo, Javier Hagmann, Gregoire Noirjean, Jose Stellfeld, Donat Valuch, Daniel |
author_sort | Baudrenghien, Philippe |
collection | CERN |
description | Linac4 is a new 86-m long normal-conducting linear accelerator that will provide 160 MeV H^{−} to the CERN PS Booster (PSB), and replace the present 50 MeV proton Linac2. The Low Level RF (LLRF) system has to control the RFQ, two choppers, three bunching cavities, twenty two accelerating cavities and one debuncher in the transfer line to the PSB. To optimize the transfer into the 1 MHz PSB bucket, the machine includes fast choppers (synchronized with the PSB RF) and a voltage modulation of the last two cavities that will provide Longitudinal Painting for optimum filling. The commissioning in the tunnel with beam has started in October 2013. So far the part consisting of the RFQ, the three bunching cavities, and the first DTL is operational. The rest of the machine will be progressively commissioned till end 2015. The paper presents the LLRF system. First results from the commissioning (with a prototype regulation system) are shown and the more sophisticated algorithms under development are presented. |
id | oai-inspirehep.net-1363546 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2014 |
record_format | invenio |
spelling | oai-inspirehep.net-13635462019-09-30T06:29:59Zhttp://cds.cern.ch/record/2062609engBaudrenghien, PhilippeGalindo, JavierHagmann, GregoireNoirjean, JoseStellfeld, DonatValuch, DanielCommissioning of the Linac4 Low Level RF and Future PlansAccelerators and Storage RingsLinac4 is a new 86-m long normal-conducting linear accelerator that will provide 160 MeV H^{−} to the CERN PS Booster (PSB), and replace the present 50 MeV proton Linac2. The Low Level RF (LLRF) system has to control the RFQ, two choppers, three bunching cavities, twenty two accelerating cavities and one debuncher in the transfer line to the PSB. To optimize the transfer into the 1 MHz PSB bucket, the machine includes fast choppers (synchronized with the PSB RF) and a voltage modulation of the last two cavities that will provide Longitudinal Painting for optimum filling. The commissioning in the tunnel with beam has started in October 2013. So far the part consisting of the RFQ, the three bunching cavities, and the first DTL is operational. The rest of the machine will be progressively commissioned till end 2015. The paper presents the LLRF system. First results from the commissioning (with a prototype regulation system) are shown and the more sophisticated algorithms under development are presented.CERN-ACC-2014-375oai:inspirehep.net:13635462014 |
spellingShingle | Accelerators and Storage Rings Baudrenghien, Philippe Galindo, Javier Hagmann, Gregoire Noirjean, Jose Stellfeld, Donat Valuch, Daniel Commissioning of the Linac4 Low Level RF and Future Plans |
title | Commissioning of the Linac4 Low Level RF and Future Plans |
title_full | Commissioning of the Linac4 Low Level RF and Future Plans |
title_fullStr | Commissioning of the Linac4 Low Level RF and Future Plans |
title_full_unstemmed | Commissioning of the Linac4 Low Level RF and Future Plans |
title_short | Commissioning of the Linac4 Low Level RF and Future Plans |
title_sort | commissioning of the linac4 low level rf and future plans |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/2062609 |
work_keys_str_mv | AT baudrenghienphilippe commissioningofthelinac4lowlevelrfandfutureplans AT galindojavier commissioningofthelinac4lowlevelrfandfutureplans AT hagmanngregoire commissioningofthelinac4lowlevelrfandfutureplans AT noirjeanjose commissioningofthelinac4lowlevelrfandfutureplans AT stellfelddonat commissioningofthelinac4lowlevelrfandfutureplans AT valuchdaniel commissioningofthelinac4lowlevelrfandfutureplans |