Design and Beamloading-Simulations of a Pre-Bunching Cavity for the CLIC Drive Beam Injector

The CLIC project is developing a multi-TeV center-of-mass electron-positron collider based on high-gradient, room-temperature accelerating structures and a novel two-beam RF power generation scheme. The RF power for the CLIC accelerating structures is provided by the so-called drive beam which is a...

Descripción completa

Detalles Bibliográficos
Autores principales: Dayyani Kelisani, Mohsen, Döbert, Steffen, Shaker, Seyd Hamed
Lenguaje:eng
Publicado: 2014
Materias:
Acceso en línea:http://cds.cern.ch/record/2025956
Descripción
Sumario:The CLIC project is developing a multi-TeV center-of-mass electron-positron collider based on high-gradient, room-temperature accelerating structures and a novel two-beam RF power generation scheme. The RF power for the CLIC accelerating structures is provided by the so-called drive beam which is a low energy, high current electron beam. The drive beam will be generated from a high current (up to 5 A) pulsed (142μs) thermionic electron gun and then followed by a bunching system. The bunching system is composed of three sub-harmonic bunchers operating at a frequency of 499.75 MHz, a pre-buncher and a traveling wave buncher both operating at 999.5MHz. The pre-buncher cavity, which has a great importance on minimization the satellite population, should be designed with special consideration of the high beam loading effect due to the high current beam crossing the cavity. In this work we report on RF design, analytical beam loading calculations and simulations for the CLIC drive beam injector pre-buncher cavity.