Cargando…

Plans for an ERL Test Facility at CERN

The baseline electron accelerator for LHeC and one option for FCC-he is an Energy Recovery Linac. To prepare and study the necessary key technologies, CERN has started – in collaboration with JLAB and Mainz University – the conceptual design of an ERL Test Facility (ERL-TF). Staged construction will...

Descripción completa

Detalles Bibliográficos
Autores principales: Jensen, Erk, Brüning, Oliver, Calaga, Rama, Schirm, Karl, Torres-Sanchez, Roberto, Valloni, Alessandra, Aulenbacher, Kurt, Bogacz, Alex, Hutton, Andrew, Klein, Max
Lenguaje:eng
Publicado: 2014
Materias:
Acceso en línea:http://cds.cern.ch/record/2025957
_version_ 1780947355598585856
author Jensen, Erk
Brüning, Oliver
Calaga, Rama
Schirm, Karl
Torres-Sanchez, Roberto
Valloni, Alessandra
Aulenbacher, Kurt
Bogacz, Alex
Hutton, Andrew
Klein, Max
author_facet Jensen, Erk
Brüning, Oliver
Calaga, Rama
Schirm, Karl
Torres-Sanchez, Roberto
Valloni, Alessandra
Aulenbacher, Kurt
Bogacz, Alex
Hutton, Andrew
Klein, Max
author_sort Jensen, Erk
collection CERN
description The baseline electron accelerator for LHeC and one option for FCC-he is an Energy Recovery Linac. To prepare and study the necessary key technologies, CERN has started – in collaboration with JLAB and Mainz University – the conceptual design of an ERL Test Facility (ERL-TF). Staged construction will allow the study under different conditions with up to 3 passes, beam energies of up to about 1 GeV and currents of up to 50 mA. The design and development of superconducting cavity modules, including coupler and HOM damper designs, are also of central importance for other existing and future accelerators and their tests are at the heart of the current ERL-TF goals. The ERL-TF could also provide a unique infrastructure for several applications that go beyond developing and testing the ERL technology at CERN. In addition to experimental studies of beam dynamics, operational and reliability issues in an ERL, it could equally serve for quench tests of superconducting magnets, as physics experimental facility on its own right or as test stand for detector developments. This contribution will describe the goals and the concept of the facility and the status of the R&D;.
id oai-inspirehep.net-1363550
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2014
record_format invenio
spelling oai-inspirehep.net-13635502019-09-30T06:29:59Zhttp://cds.cern.ch/record/2025957engJensen, ErkBrüning, OliverCalaga, RamaSchirm, KarlTorres-Sanchez, RobertoValloni, AlessandraAulenbacher, KurtBogacz, AlexHutton, AndrewKlein, MaxPlans for an ERL Test Facility at CERNAccelerators and Storage RingsThe baseline electron accelerator for LHeC and one option for FCC-he is an Energy Recovery Linac. To prepare and study the necessary key technologies, CERN has started – in collaboration with JLAB and Mainz University – the conceptual design of an ERL Test Facility (ERL-TF). Staged construction will allow the study under different conditions with up to 3 passes, beam energies of up to about 1 GeV and currents of up to 50 mA. The design and development of superconducting cavity modules, including coupler and HOM damper designs, are also of central importance for other existing and future accelerators and their tests are at the heart of the current ERL-TF goals. The ERL-TF could also provide a unique infrastructure for several applications that go beyond developing and testing the ERL technology at CERN. In addition to experimental studies of beam dynamics, operational and reliability issues in an ERL, it could equally serve for quench tests of superconducting magnets, as physics experimental facility on its own right or as test stand for detector developments. This contribution will describe the goals and the concept of the facility and the status of the R&D;.CERN-ACC-2014-398oai:inspirehep.net:13635502014
spellingShingle Accelerators and Storage Rings
Jensen, Erk
Brüning, Oliver
Calaga, Rama
Schirm, Karl
Torres-Sanchez, Roberto
Valloni, Alessandra
Aulenbacher, Kurt
Bogacz, Alex
Hutton, Andrew
Klein, Max
Plans for an ERL Test Facility at CERN
title Plans for an ERL Test Facility at CERN
title_full Plans for an ERL Test Facility at CERN
title_fullStr Plans for an ERL Test Facility at CERN
title_full_unstemmed Plans for an ERL Test Facility at CERN
title_short Plans for an ERL Test Facility at CERN
title_sort plans for an erl test facility at cern
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/2025957
work_keys_str_mv AT jensenerk plansforanerltestfacilityatcern
AT bruningoliver plansforanerltestfacilityatcern
AT calagarama plansforanerltestfacilityatcern
AT schirmkarl plansforanerltestfacilityatcern
AT torressanchezroberto plansforanerltestfacilityatcern
AT vallonialessandra plansforanerltestfacilityatcern
AT aulenbacherkurt plansforanerltestfacilityatcern
AT bogaczalex plansforanerltestfacilityatcern
AT huttonandrew plansforanerltestfacilityatcern
AT kleinmax plansforanerltestfacilityatcern