CERN Linac4 Drift Tube Linac Manufacturing and Assembly
The manufacturing of the Linac4 Drift Tube Linac (DTL) components has been completed and the assembly of the structures is in its final stages. 3 tanks of 3.9m, 7.3m, and 7.3m, designed to accelerate a 40mA average pulse current H–beam from 3 to 50MeV, are being assembled from 2, 4 and 4 segments of...
Autores principales: | , , , , , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2014
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2062615 |
_version_ | 1780948557103104000 |
---|---|
author | Ramberger, Suitbert Bourquin, Pierre Cherif, Ahmed Cuvet, Yves Dallocchio, Alessandro Favre, Gilles Fuchs, Jean-Frederic Geisser, Jean-Marie Gerigk, Frank Giguet, Jean-Michel Hansen, Jan Polini, Marc Sgobba, Stefano Thaus, Nicolas Vretenar, Maurizio |
author_facet | Ramberger, Suitbert Bourquin, Pierre Cherif, Ahmed Cuvet, Yves Dallocchio, Alessandro Favre, Gilles Fuchs, Jean-Frederic Geisser, Jean-Marie Gerigk, Frank Giguet, Jean-Michel Hansen, Jan Polini, Marc Sgobba, Stefano Thaus, Nicolas Vretenar, Maurizio |
author_sort | Ramberger, Suitbert |
collection | CERN |
description | The manufacturing of the Linac4 Drift Tube Linac (DTL) components has been completed and the assembly of the structures is in its final stages. 3 tanks of 3.9m, 7.3m, and 7.3m, designed to accelerate a 40mA average pulse current H–beam from 3 to 50MeV, are being assembled from 2, 4 and 4 segments of about 2.0m length, containing each from 22 drift tubes at the low energy end, down to only 6 at the high energy end. Due to its peculiar design avoiding adjustment mechanisms on the drift tube, tight tolerances have to be maintained in the production. This paper discusses the assembly stages that are used to achieve the tolerances over the full length of the structures. Metrology results on the assembled DTL Tank1 confirm the required precision. |
id | oai-inspirehep.net-1363555 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2014 |
record_format | invenio |
spelling | oai-inspirehep.net-13635552019-09-30T06:29:59Zhttp://cds.cern.ch/record/2062615engRamberger, SuitbertBourquin, PierreCherif, AhmedCuvet, YvesDallocchio, AlessandroFavre, GillesFuchs, Jean-FredericGeisser, Jean-MarieGerigk, FrankGiguet, Jean-MichelHansen, JanPolini, MarcSgobba, StefanoThaus, NicolasVretenar, MaurizioCERN Linac4 Drift Tube Linac Manufacturing and AssemblyAccelerators and Storage RingsThe manufacturing of the Linac4 Drift Tube Linac (DTL) components has been completed and the assembly of the structures is in its final stages. 3 tanks of 3.9m, 7.3m, and 7.3m, designed to accelerate a 40mA average pulse current H–beam from 3 to 50MeV, are being assembled from 2, 4 and 4 segments of about 2.0m length, containing each from 22 drift tubes at the low energy end, down to only 6 at the high energy end. Due to its peculiar design avoiding adjustment mechanisms on the drift tube, tight tolerances have to be maintained in the production. This paper discusses the assembly stages that are used to achieve the tolerances over the full length of the structures. Metrology results on the assembled DTL Tank1 confirm the required precision.CERN-ACC-2014-369oai:inspirehep.net:13635552014 |
spellingShingle | Accelerators and Storage Rings Ramberger, Suitbert Bourquin, Pierre Cherif, Ahmed Cuvet, Yves Dallocchio, Alessandro Favre, Gilles Fuchs, Jean-Frederic Geisser, Jean-Marie Gerigk, Frank Giguet, Jean-Michel Hansen, Jan Polini, Marc Sgobba, Stefano Thaus, Nicolas Vretenar, Maurizio CERN Linac4 Drift Tube Linac Manufacturing and Assembly |
title | CERN Linac4 Drift Tube Linac Manufacturing and Assembly |
title_full | CERN Linac4 Drift Tube Linac Manufacturing and Assembly |
title_fullStr | CERN Linac4 Drift Tube Linac Manufacturing and Assembly |
title_full_unstemmed | CERN Linac4 Drift Tube Linac Manufacturing and Assembly |
title_short | CERN Linac4 Drift Tube Linac Manufacturing and Assembly |
title_sort | cern linac4 drift tube linac manufacturing and assembly |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/2062615 |
work_keys_str_mv | AT rambergersuitbert cernlinac4drifttubelinacmanufacturingandassembly AT bourquinpierre cernlinac4drifttubelinacmanufacturingandassembly AT cherifahmed cernlinac4drifttubelinacmanufacturingandassembly AT cuvetyves cernlinac4drifttubelinacmanufacturingandassembly AT dallocchioalessandro cernlinac4drifttubelinacmanufacturingandassembly AT favregilles cernlinac4drifttubelinacmanufacturingandassembly AT fuchsjeanfrederic cernlinac4drifttubelinacmanufacturingandassembly AT geisserjeanmarie cernlinac4drifttubelinacmanufacturingandassembly AT gerigkfrank cernlinac4drifttubelinacmanufacturingandassembly AT giguetjeanmichel cernlinac4drifttubelinacmanufacturingandassembly AT hansenjan cernlinac4drifttubelinacmanufacturingandassembly AT polinimarc cernlinac4drifttubelinacmanufacturingandassembly AT sgobbastefano cernlinac4drifttubelinacmanufacturingandassembly AT thausnicolas cernlinac4drifttubelinacmanufacturingandassembly AT vretenarmaurizio cernlinac4drifttubelinacmanufacturingandassembly |