Commissioning and Operational Experience Gained with the Linac4 RFQ at CERN

The installation of Linac4 has started in 2013 with the 3 MeV Front End, aiming at delivering a fully commissioned 160 MeV H^{−} beam by 2016. During summer 2013 the H^{−} ion source, a clone of the first prototype, and the Low Energy Beam Transport lines have been installed in the Linac4 tunnel fol...

Descripción completa

Detalles Bibliográficos
Autores principales: Rossi, Carlo, Arnaudon, Luca, Baudrenghien, Philippe, Bellodi, Giulia, Brunner, Olivier, Hansen, Jan, Lallement, Jean-Baptiste, Lombardi, Alessandra, Noirjean, Jose, Desmons, Michel, France, Alain, Piquet, Olivier
Lenguaje:eng
Publicado: 2014
Materias:
Acceso en línea:http://cds.cern.ch/record/2062616
_version_ 1780948557313867776
author Rossi, Carlo
Arnaudon, Luca
Baudrenghien, Philippe
Bellodi, Giulia
Brunner, Olivier
Hansen, Jan
Lallement, Jean-Baptiste
Lombardi, Alessandra
Noirjean, Jose
Desmons, Michel
France, Alain
Piquet, Olivier
author_facet Rossi, Carlo
Arnaudon, Luca
Baudrenghien, Philippe
Bellodi, Giulia
Brunner, Olivier
Hansen, Jan
Lallement, Jean-Baptiste
Lombardi, Alessandra
Noirjean, Jose
Desmons, Michel
France, Alain
Piquet, Olivier
author_sort Rossi, Carlo
collection CERN
description The installation of Linac4 has started in 2013 with the 3 MeV Front End, aiming at delivering a fully commissioned 160 MeV H^{−} beam by 2016. During summer 2013 the H^{−} ion source, a clone of the first prototype, and the Low Energy Beam Transport lines have been installed in the Linac4 tunnel followed shortly by the Radiofrequency Quadrupole accelerator (RFQ), operating at the RF frequency of 352.2 MHz and which accelerates the ion beam to the energy of 3 MeV. The RFQ, which had already been commissioned at the 3 MeV Test Stand, was this time driven by a fully digital LLRF system. This paper reports the result of the bead-pull field check performed after the installation in the tunnel, the experience gained during recommissioning and the results of field characterization as a function of the water temperature in the RFQ cooling channels, showing how the accelerating field can be adjusted by simply tuning the different cavity modules.
id oai-inspirehep.net-1363556
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2014
record_format invenio
spelling oai-inspirehep.net-13635562019-09-30T06:29:59Zhttp://cds.cern.ch/record/2062616engRossi, CarloArnaudon, LucaBaudrenghien, PhilippeBellodi, GiuliaBrunner, OlivierHansen, JanLallement, Jean-BaptisteLombardi, AlessandraNoirjean, JoseDesmons, MichelFrance, AlainPiquet, OlivierCommissioning and Operational Experience Gained with the Linac4 RFQ at CERNAccelerators and Storage RingsThe installation of Linac4 has started in 2013 with the 3 MeV Front End, aiming at delivering a fully commissioned 160 MeV H^{−} beam by 2016. During summer 2013 the H^{−} ion source, a clone of the first prototype, and the Low Energy Beam Transport lines have been installed in the Linac4 tunnel followed shortly by the Radiofrequency Quadrupole accelerator (RFQ), operating at the RF frequency of 352.2 MHz and which accelerates the ion beam to the energy of 3 MeV. The RFQ, which had already been commissioned at the 3 MeV Test Stand, was this time driven by a fully digital LLRF system. This paper reports the result of the bead-pull field check performed after the installation in the tunnel, the experience gained during recommissioning and the results of field characterization as a function of the water temperature in the RFQ cooling channels, showing how the accelerating field can be adjusted by simply tuning the different cavity modules.CERN-ACC-2014-368oai:inspirehep.net:13635562014
spellingShingle Accelerators and Storage Rings
Rossi, Carlo
Arnaudon, Luca
Baudrenghien, Philippe
Bellodi, Giulia
Brunner, Olivier
Hansen, Jan
Lallement, Jean-Baptiste
Lombardi, Alessandra
Noirjean, Jose
Desmons, Michel
France, Alain
Piquet, Olivier
Commissioning and Operational Experience Gained with the Linac4 RFQ at CERN
title Commissioning and Operational Experience Gained with the Linac4 RFQ at CERN
title_full Commissioning and Operational Experience Gained with the Linac4 RFQ at CERN
title_fullStr Commissioning and Operational Experience Gained with the Linac4 RFQ at CERN
title_full_unstemmed Commissioning and Operational Experience Gained with the Linac4 RFQ at CERN
title_short Commissioning and Operational Experience Gained with the Linac4 RFQ at CERN
title_sort commissioning and operational experience gained with the linac4 rfq at cern
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/2062616
work_keys_str_mv AT rossicarlo commissioningandoperationalexperiencegainedwiththelinac4rfqatcern
AT arnaudonluca commissioningandoperationalexperiencegainedwiththelinac4rfqatcern
AT baudrenghienphilippe commissioningandoperationalexperiencegainedwiththelinac4rfqatcern
AT bellodigiulia commissioningandoperationalexperiencegainedwiththelinac4rfqatcern
AT brunnerolivier commissioningandoperationalexperiencegainedwiththelinac4rfqatcern
AT hansenjan commissioningandoperationalexperiencegainedwiththelinac4rfqatcern
AT lallementjeanbaptiste commissioningandoperationalexperiencegainedwiththelinac4rfqatcern
AT lombardialessandra commissioningandoperationalexperiencegainedwiththelinac4rfqatcern
AT noirjeanjose commissioningandoperationalexperiencegainedwiththelinac4rfqatcern
AT desmonsmichel commissioningandoperationalexperiencegainedwiththelinac4rfqatcern
AT francealain commissioningandoperationalexperiencegainedwiththelinac4rfqatcern
AT piquetolivier commissioningandoperationalexperiencegainedwiththelinac4rfqatcern