Cargando…
Commissioning and Operational Experience Gained with the Linac4 RFQ at CERN
The installation of Linac4 has started in 2013 with the 3 MeV Front End, aiming at delivering a fully commissioned 160 MeV H^{−} beam by 2016. During summer 2013 the H^{−} ion source, a clone of the first prototype, and the Low Energy Beam Transport lines have been installed in the Linac4 tunnel fol...
Autores principales: | , , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2014
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2062616 |
_version_ | 1780948557313867776 |
---|---|
author | Rossi, Carlo Arnaudon, Luca Baudrenghien, Philippe Bellodi, Giulia Brunner, Olivier Hansen, Jan Lallement, Jean-Baptiste Lombardi, Alessandra Noirjean, Jose Desmons, Michel France, Alain Piquet, Olivier |
author_facet | Rossi, Carlo Arnaudon, Luca Baudrenghien, Philippe Bellodi, Giulia Brunner, Olivier Hansen, Jan Lallement, Jean-Baptiste Lombardi, Alessandra Noirjean, Jose Desmons, Michel France, Alain Piquet, Olivier |
author_sort | Rossi, Carlo |
collection | CERN |
description | The installation of Linac4 has started in 2013 with the 3 MeV Front End, aiming at delivering a fully commissioned 160 MeV H^{−} beam by 2016. During summer 2013 the H^{−} ion source, a clone of the first prototype, and the Low Energy Beam Transport lines have been installed in the Linac4 tunnel followed shortly by the Radiofrequency Quadrupole accelerator (RFQ), operating at the RF frequency of 352.2 MHz and which accelerates the ion beam to the energy of 3 MeV. The RFQ, which had already been commissioned at the 3 MeV Test Stand, was this time driven by a fully digital LLRF system. This paper reports the result of the bead-pull field check performed after the installation in the tunnel, the experience gained during recommissioning and the results of field characterization as a function of the water temperature in the RFQ cooling channels, showing how the accelerating field can be adjusted by simply tuning the different cavity modules. |
id | oai-inspirehep.net-1363556 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2014 |
record_format | invenio |
spelling | oai-inspirehep.net-13635562019-09-30T06:29:59Zhttp://cds.cern.ch/record/2062616engRossi, CarloArnaudon, LucaBaudrenghien, PhilippeBellodi, GiuliaBrunner, OlivierHansen, JanLallement, Jean-BaptisteLombardi, AlessandraNoirjean, JoseDesmons, MichelFrance, AlainPiquet, OlivierCommissioning and Operational Experience Gained with the Linac4 RFQ at CERNAccelerators and Storage RingsThe installation of Linac4 has started in 2013 with the 3 MeV Front End, aiming at delivering a fully commissioned 160 MeV H^{−} beam by 2016. During summer 2013 the H^{−} ion source, a clone of the first prototype, and the Low Energy Beam Transport lines have been installed in the Linac4 tunnel followed shortly by the Radiofrequency Quadrupole accelerator (RFQ), operating at the RF frequency of 352.2 MHz and which accelerates the ion beam to the energy of 3 MeV. The RFQ, which had already been commissioned at the 3 MeV Test Stand, was this time driven by a fully digital LLRF system. This paper reports the result of the bead-pull field check performed after the installation in the tunnel, the experience gained during recommissioning and the results of field characterization as a function of the water temperature in the RFQ cooling channels, showing how the accelerating field can be adjusted by simply tuning the different cavity modules.CERN-ACC-2014-368oai:inspirehep.net:13635562014 |
spellingShingle | Accelerators and Storage Rings Rossi, Carlo Arnaudon, Luca Baudrenghien, Philippe Bellodi, Giulia Brunner, Olivier Hansen, Jan Lallement, Jean-Baptiste Lombardi, Alessandra Noirjean, Jose Desmons, Michel France, Alain Piquet, Olivier Commissioning and Operational Experience Gained with the Linac4 RFQ at CERN |
title | Commissioning and Operational Experience Gained with the Linac4 RFQ at CERN |
title_full | Commissioning and Operational Experience Gained with the Linac4 RFQ at CERN |
title_fullStr | Commissioning and Operational Experience Gained with the Linac4 RFQ at CERN |
title_full_unstemmed | Commissioning and Operational Experience Gained with the Linac4 RFQ at CERN |
title_short | Commissioning and Operational Experience Gained with the Linac4 RFQ at CERN |
title_sort | commissioning and operational experience gained with the linac4 rfq at cern |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/2062616 |
work_keys_str_mv | AT rossicarlo commissioningandoperationalexperiencegainedwiththelinac4rfqatcern AT arnaudonluca commissioningandoperationalexperiencegainedwiththelinac4rfqatcern AT baudrenghienphilippe commissioningandoperationalexperiencegainedwiththelinac4rfqatcern AT bellodigiulia commissioningandoperationalexperiencegainedwiththelinac4rfqatcern AT brunnerolivier commissioningandoperationalexperiencegainedwiththelinac4rfqatcern AT hansenjan commissioningandoperationalexperiencegainedwiththelinac4rfqatcern AT lallementjeanbaptiste commissioningandoperationalexperiencegainedwiththelinac4rfqatcern AT lombardialessandra commissioningandoperationalexperiencegainedwiththelinac4rfqatcern AT noirjeanjose commissioningandoperationalexperiencegainedwiththelinac4rfqatcern AT desmonsmichel commissioningandoperationalexperiencegainedwiththelinac4rfqatcern AT francealain commissioningandoperationalexperiencegainedwiththelinac4rfqatcern AT piquetolivier commissioningandoperationalexperiencegainedwiththelinac4rfqatcern |