Cargando…
Commissioning and Operational Experience Gained with the Linac4 RFQ at CERN
The installation of Linac4 has started in 2013 with the 3 MeV Front End, aiming at delivering a fully commissioned 160 MeV H^{−} beam by 2016. During summer 2013 the H^{−} ion source, a clone of the first prototype, and the Low Energy Beam Transport lines have been installed in the Linac4 tunnel fol...
Autores principales: | Rossi, Carlo, Arnaudon, Luca, Baudrenghien, Philippe, Bellodi, Giulia, Brunner, Olivier, Hansen, Jan, Lallement, Jean-Baptiste, Lombardi, Alessandra, Noirjean, Jose, Desmons, Michel, France, Alain, Piquet, Olivier |
---|---|
Lenguaje: | eng |
Publicado: |
2014
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2062616 |
Ejemplares similares
-
Commissioning of the Linac4 RFQ at the 3 MeV test stand
por: Rossi, C, et al.
Publicado: (2013) -
The RF Design of the Linac4 RFQ
por: Piquet, Olivier, et al.
Publicado: (2010) -
RF Tuning of the LINAC4 RFQ
por: Piquet, Olivier, et al.
Publicado: (2013) -
Redesign of CERN LINAC3 RFQ for Lead 29+
por: Benedetti, Stefano, et al.
Publicado: (2018) -
RF Design and Tuning of Linac4 RFQ
por: France, A C, et al.
Publicado: (2012)