Status of the 11 T Nb$_{3}$Sn Dipole Project for the LHC

The planned upgrade of the LHC collimation system includes additional collimators in the LHC lattice. The longitudinal space for the collimators could be obtained by replacing some LHC main dipoles with shorter but stronger dipoles compatible with the LHC lattice and main systems. A joint developmen...

Descripción completa

Detalles Bibliográficos
Autores principales: Savary, F, Andreev, N, Apollinari, G, Auchmann, B, Barzi, E, Bruce, R, Chlachidze, G, De Maria, R, DiMarco, J, Duarte Ramos, D, Giovannozzi, M, Holzer, B, Jowett, J M, Izquierdo Bermudez, S, Karppinen, M, Kirby, G, Lackner, F, Moron-Ballester, R, Nobrega, A R, Novitski, I, Oberli, L, Parma, V, Perez, J C, Prin, H, Redaelli, S, Rossi, L, Smekens, D, Thiesen, H, Turrioni, D, Velev, G, Zlobin, A V
Lenguaje:eng
Publicado: 2015
Materias:
Acceso en línea:https://dx.doi.org/10.1109/TASC.2014.2375914
http://cds.cern.ch/record/2159024
_version_ 1780950817726005248
author Savary, F
Andreev, N
Apollinari, G
Auchmann, B
Barzi, E
Bruce, R
Chlachidze, G
De Maria, R
DiMarco, J
Duarte Ramos, D
Giovannozzi, M
Holzer, B
Jowett, J M
Izquierdo Bermudez, S
Karppinen, M
Kirby, G
Lackner, F
Moron-Ballester, R
Nobrega, A R
Novitski, I
Oberli, L
Parma, V
Perez, J C
Prin, H
Redaelli, S
Rossi, L
Smekens, D
Thiesen, H
Turrioni, D
Velev, G
Zlobin, A V
author_facet Savary, F
Andreev, N
Apollinari, G
Auchmann, B
Barzi, E
Bruce, R
Chlachidze, G
De Maria, R
DiMarco, J
Duarte Ramos, D
Giovannozzi, M
Holzer, B
Jowett, J M
Izquierdo Bermudez, S
Karppinen, M
Kirby, G
Lackner, F
Moron-Ballester, R
Nobrega, A R
Novitski, I
Oberli, L
Parma, V
Perez, J C
Prin, H
Redaelli, S
Rossi, L
Smekens, D
Thiesen, H
Turrioni, D
Velev, G
Zlobin, A V
author_sort Savary, F
collection CERN
description The planned upgrade of the LHC collimation system includes additional collimators in the LHC lattice. The longitudinal space for the collimators could be obtained by replacing some LHC main dipoles with shorter but stronger dipoles compatible with the LHC lattice and main systems. A joint development program with the goal of building a 5.5 m long two-in-one aperture Nb_3Sn dipole prototype suitable for installation in the LHC is being conducted by FNAL and CERN magnet groups. As part of the first phase of the program, 1 m long and 2 m long single aperture models are being built and tested, and the collared coils from these magnets will be assembled and tested in two-in-one configuration in both laboratories. In parallel with the short model magnet activities, the work has started on the production line in view of the scale-up to 5.5 m long prototype magnet. The development of the final cryo-assembly comprising two 5.5 m long 11 T dipole cold masses and the warm collimator in the middle, fully compatible with the LHC main systems and the existing machine interfaces, has also started at CERN. This paper summarizes the progress made at CERN and FNAL towards the construction of 5.5 m long 11 T Nb_3Sn dipole prototype and the present status of the activities related to the integration of the 11 T dipole and collimator in the LHC.
id oai-inspirehep.net-1369216
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2015
record_format invenio
spelling oai-inspirehep.net-13692162019-09-30T06:29:59Zdoi:10.1109/TASC.2014.2375914http://cds.cern.ch/record/2159024engSavary, FAndreev, NApollinari, GAuchmann, BBarzi, EBruce, RChlachidze, GDe Maria, RDiMarco, JDuarte Ramos, DGiovannozzi, MHolzer, BJowett, J MIzquierdo Bermudez, SKarppinen, MKirby, GLackner, FMoron-Ballester, RNobrega, A RNovitski, IOberli, LParma, VPerez, J CPrin, HRedaelli, SRossi, LSmekens, DThiesen, HTurrioni, DVelev, GZlobin, A VStatus of the 11 T Nb$_{3}$Sn Dipole Project for the LHCAccelerators and Storage RingsThe planned upgrade of the LHC collimation system includes additional collimators in the LHC lattice. The longitudinal space for the collimators could be obtained by replacing some LHC main dipoles with shorter but stronger dipoles compatible with the LHC lattice and main systems. A joint development program with the goal of building a 5.5 m long two-in-one aperture Nb_3Sn dipole prototype suitable for installation in the LHC is being conducted by FNAL and CERN magnet groups. As part of the first phase of the program, 1 m long and 2 m long single aperture models are being built and tested, and the collared coils from these magnets will be assembled and tested in two-in-one configuration in both laboratories. In parallel with the short model magnet activities, the work has started on the production line in view of the scale-up to 5.5 m long prototype magnet. The development of the final cryo-assembly comprising two 5.5 m long 11 T dipole cold masses and the warm collimator in the middle, fully compatible with the LHC main systems and the existing machine interfaces, has also started at CERN. This paper summarizes the progress made at CERN and FNAL towards the construction of 5.5 m long 11 T Nb_3Sn dipole prototype and the present status of the activities related to the integration of the 11 T dipole and collimator in the LHC.FERMILAB-CONF-15-238-TDoai:inspirehep.net:13692162015
spellingShingle Accelerators and Storage Rings
Savary, F
Andreev, N
Apollinari, G
Auchmann, B
Barzi, E
Bruce, R
Chlachidze, G
De Maria, R
DiMarco, J
Duarte Ramos, D
Giovannozzi, M
Holzer, B
Jowett, J M
Izquierdo Bermudez, S
Karppinen, M
Kirby, G
Lackner, F
Moron-Ballester, R
Nobrega, A R
Novitski, I
Oberli, L
Parma, V
Perez, J C
Prin, H
Redaelli, S
Rossi, L
Smekens, D
Thiesen, H
Turrioni, D
Velev, G
Zlobin, A V
Status of the 11 T Nb$_{3}$Sn Dipole Project for the LHC
title Status of the 11 T Nb$_{3}$Sn Dipole Project for the LHC
title_full Status of the 11 T Nb$_{3}$Sn Dipole Project for the LHC
title_fullStr Status of the 11 T Nb$_{3}$Sn Dipole Project for the LHC
title_full_unstemmed Status of the 11 T Nb$_{3}$Sn Dipole Project for the LHC
title_short Status of the 11 T Nb$_{3}$Sn Dipole Project for the LHC
title_sort status of the 11 t nb$_{3}$sn dipole project for the lhc
topic Accelerators and Storage Rings
url https://dx.doi.org/10.1109/TASC.2014.2375914
http://cds.cern.ch/record/2159024
work_keys_str_mv AT savaryf statusofthe11tnb3sndipoleprojectforthelhc
AT andreevn statusofthe11tnb3sndipoleprojectforthelhc
AT apollinarig statusofthe11tnb3sndipoleprojectforthelhc
AT auchmannb statusofthe11tnb3sndipoleprojectforthelhc
AT barzie statusofthe11tnb3sndipoleprojectforthelhc
AT brucer statusofthe11tnb3sndipoleprojectforthelhc
AT chlachidzeg statusofthe11tnb3sndipoleprojectforthelhc
AT demariar statusofthe11tnb3sndipoleprojectforthelhc
AT dimarcoj statusofthe11tnb3sndipoleprojectforthelhc
AT duarteramosd statusofthe11tnb3sndipoleprojectforthelhc
AT giovannozzim statusofthe11tnb3sndipoleprojectforthelhc
AT holzerb statusofthe11tnb3sndipoleprojectforthelhc
AT jowettjm statusofthe11tnb3sndipoleprojectforthelhc
AT izquierdobermudezs statusofthe11tnb3sndipoleprojectforthelhc
AT karppinenm statusofthe11tnb3sndipoleprojectforthelhc
AT kirbyg statusofthe11tnb3sndipoleprojectforthelhc
AT lacknerf statusofthe11tnb3sndipoleprojectforthelhc
AT moronballesterr statusofthe11tnb3sndipoleprojectforthelhc
AT nobregaar statusofthe11tnb3sndipoleprojectforthelhc
AT novitskii statusofthe11tnb3sndipoleprojectforthelhc
AT oberlil statusofthe11tnb3sndipoleprojectforthelhc
AT parmav statusofthe11tnb3sndipoleprojectforthelhc
AT perezjc statusofthe11tnb3sndipoleprojectforthelhc
AT prinh statusofthe11tnb3sndipoleprojectforthelhc
AT redaellis statusofthe11tnb3sndipoleprojectforthelhc
AT rossil statusofthe11tnb3sndipoleprojectforthelhc
AT smekensd statusofthe11tnb3sndipoleprojectforthelhc
AT thiesenh statusofthe11tnb3sndipoleprojectforthelhc
AT turrionid statusofthe11tnb3sndipoleprojectforthelhc
AT velevg statusofthe11tnb3sndipoleprojectforthelhc
AT zlobinav statusofthe11tnb3sndipoleprojectforthelhc