High-Power Proton Linac Technology at CERN
The construction of Linac4, a 160 MeV H^− linac started in 2008 and is now in the beam commissioning phase. The RFQ and MEBT line have been successfully commissioned; and installation and beam measurements of the 50 MeV DTL have started in 2014. Linac4 was conceived as the normal conducting front-en...