Cargando…

High-Power Proton Linac Technology at CERN

The construction of Linac4, a 160 MeV H^− linac started in 2008 and is now in the beam commissioning phase. The RFQ and MEBT line have been successfully commissioned; and installation and beam measurements of the 50 MeV DTL have started in 2014. Linac4 was conceived as the normal conducting front-en...

Descripción completa

Detalles Bibliográficos
Autor principal: Gerigk, Frank
Lenguaje:eng
Publicado: 2015
Materias:
Acceso en línea:https://dx.doi.org/10.7566/JPSCP.8.011005
http://cds.cern.ch/record/2159175