Design and operational aspects of a bi-polar semi-conductor switch as possible candidate for replacement of electro-mechanical switchgear in energy extraction systems for the LHC corrector magnet circuits
More than 600 DC opening switches assure the role of energy extraction in the powering circuits of the bipolar, superconducting beam corrector magnet chains in the LHC collider at CERN. Although the operational experience from several years of extensive use has proven the high reliability of the ele...
Autores principales: | Coelingh, G J, Dahlerup-Petersen, K, Erokhin, A, Panev, B |
---|---|
Lenguaje: | eng |
Publicado: |
2014
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1109/IPMHVC.2014.7287323 http://cds.cern.ch/record/2198353 |
Ejemplares similares
-
Test results of a 7.5 kA semi-conductor prototype switch as modular switchgear in energy extraction systems for the HL-LHC magnet test facility
por: Coelingh, G J, et al.
Publicado: (2016) -
A high-current, IGBT-based static switch for energy extraction in superconducting power circuits: Concept, design and production of a 30 kA monopolar and a 1 kA bipolar fast opening switches
por: Dahlerup-Petersen, K, et al.
Publicado: (2017) -
Electro-Mechanial Aspects of the Interconnection of the LHC Superconducting Corrector Magnets
por: Tock, J P, et al.
Publicado: (2004) -
Arc detector system for extraction switches in LHC CERN
por: Dahlerup-Petersen, K, et al.
Publicado: (2006) -
Semi-conductors
por: Wright, Donald Arthur
Publicado: (1958)