Cargando…

Standardization of automated industrial test equipment for mass production of control systems

Power converters and their controls electronics are key elements for the operation of the CERN accelerator complex, having a direct impact on its availability. They must be designed to achieve a high Mean Time Between Failure (MTBF) and hardware reliability must be ensured by board level testing bef...

Descripción completa

Detalles Bibliográficos
Autores principales: Voto, Adriana, Dai, Iosifina Panagiota, Oleniuk, Patryk Wojciech, Todd, Benjamin
Lenguaje:eng
Publicado: 2016
Materias:
Acceso en línea:https://dx.doi.org/10.1088/1748-0221/11/01/C01047
http://cds.cern.ch/record/2139378
_version_ 1780950079508578304
author Voto, Adriana
Dai, Iosifina Panagiota
Oleniuk, Patryk Wojciech
Todd, Benjamin
author_facet Voto, Adriana
Dai, Iosifina Panagiota
Oleniuk, Patryk Wojciech
Todd, Benjamin
author_sort Voto, Adriana
collection CERN
description Power converters and their controls electronics are key elements for the operation of the CERN accelerator complex, having a direct impact on its availability. They must be designed to achieve a high Mean Time Between Failure (MTBF) and hardware reliability must be ensured by board level testing before hardware is assembled and installed. In this framework, the National Instrument PCI extension for Instrumentation (PXI) was chosen as standard platform for the development of testers. This paper reports on the design strategy and approach used focusing on the tester hardware, firmware and software development.
id oai-inspirehep.net-1416702
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2016
record_format invenio
spelling oai-inspirehep.net-14167022022-08-10T12:45:01Zdoi:10.1088/1748-0221/11/01/C01047http://cds.cern.ch/record/2139378engVoto, AdrianaDai, Iosifina PanagiotaOleniuk, Patryk WojciechTodd, BenjaminStandardization of automated industrial test equipment for mass production of control systemsAccelerators and Storage RingsEngineeringPower converters and their controls electronics are key elements for the operation of the CERN accelerator complex, having a direct impact on its availability. They must be designed to achieve a high Mean Time Between Failure (MTBF) and hardware reliability must be ensured by board level testing before hardware is assembled and installed. In this framework, the National Instrument PCI extension for Instrumentation (PXI) was chosen as standard platform for the development of testers. This paper reports on the design strategy and approach used focusing on the tester hardware, firmware and software development.CERN-ACC-2016-0009oai:inspirehep.net:14167022016-01-19
spellingShingle Accelerators and Storage Rings
Engineering
Voto, Adriana
Dai, Iosifina Panagiota
Oleniuk, Patryk Wojciech
Todd, Benjamin
Standardization of automated industrial test equipment for mass production of control systems
title Standardization of automated industrial test equipment for mass production of control systems
title_full Standardization of automated industrial test equipment for mass production of control systems
title_fullStr Standardization of automated industrial test equipment for mass production of control systems
title_full_unstemmed Standardization of automated industrial test equipment for mass production of control systems
title_short Standardization of automated industrial test equipment for mass production of control systems
title_sort standardization of automated industrial test equipment for mass production of control systems
topic Accelerators and Storage Rings
Engineering
url https://dx.doi.org/10.1088/1748-0221/11/01/C01047
http://cds.cern.ch/record/2139378
work_keys_str_mv AT votoadriana standardizationofautomatedindustrialtestequipmentformassproductionofcontrolsystems
AT daiiosifinapanagiota standardizationofautomatedindustrialtestequipmentformassproductionofcontrolsystems
AT oleniukpatrykwojciech standardizationofautomatedindustrialtestequipmentformassproductionofcontrolsystems
AT toddbenjamin standardizationofautomatedindustrialtestequipmentformassproductionofcontrolsystems