LHC Commissioning at Higher Energy

The LHC has just come to the end of its first Long Shutdown (LS1) and preparations are underway to prepare for Run 2 data taking at 13 TeV centre of mass energy. After briefly recalling the major work undertaken during the 2-year long LS1, details will be given of the cool-down and hardware commissi...

Descripción completa

Detalles Bibliográficos
Autores principales: Collier, Paul, Bordry, Frederick, Wenninger, Jorg
Lenguaje:eng
Publicado: 2015
Materias:
Acceso en línea:http://cds.cern.ch/record/2141759
_version_ 1780950142601396224
author Collier, Paul
Bordry, Frederick
Wenninger, Jorg
author_facet Collier, Paul
Bordry, Frederick
Wenninger, Jorg
author_sort Collier, Paul
collection CERN
description The LHC has just come to the end of its first Long Shutdown (LS1) and preparations are underway to prepare for Run 2 data taking at 13 TeV centre of mass energy. After briefly recalling the major work undertaken during the 2-year long LS1, details will be given of the cool-down and hardware commissioning phase where each individual superconducting circuit is individually qualified for operation at nominal current. For the main dipole circuits this phase was completed with a quench training campaign in order to operate reliably at the required field. In parallel to the training campaign a rigorous cold checkout has been used to qualify the machine as an ensemble and to establish the conditions necessary for beam operation. The details of this phase will be given together with associated dry runs and beam injection tests. Finally, the latest news will be presented concerning the beam commissioning of the machine in preparation for first physics operation, which will hopefully begin in June.
id oai-inspirehep.net-1417180
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2015
record_format invenio
spelling oai-inspirehep.net-14171802022-08-10T12:59:17Zhttp://cds.cern.ch/record/2141759engCollier, PaulBordry, FrederickWenninger, JorgLHC Commissioning at Higher EnergyAccelerators and Storage RingsThe LHC has just come to the end of its first Long Shutdown (LS1) and preparations are underway to prepare for Run 2 data taking at 13 TeV centre of mass energy. After briefly recalling the major work undertaken during the 2-year long LS1, details will be given of the cool-down and hardware commissioning phase where each individual superconducting circuit is individually qualified for operation at nominal current. For the main dipole circuits this phase was completed with a quench training campaign in order to operate reliably at the required field. In parallel to the training campaign a rigorous cold checkout has been used to qualify the machine as an ensemble and to establish the conditions necessary for beam operation. The details of this phase will be given together with associated dry runs and beam injection tests. Finally, the latest news will be presented concerning the beam commissioning of the machine in preparation for first physics operation, which will hopefully begin in June.CERN-ACC-2015-355oai:inspirehep.net:14171802015
spellingShingle Accelerators and Storage Rings
Collier, Paul
Bordry, Frederick
Wenninger, Jorg
LHC Commissioning at Higher Energy
title LHC Commissioning at Higher Energy
title_full LHC Commissioning at Higher Energy
title_fullStr LHC Commissioning at Higher Energy
title_full_unstemmed LHC Commissioning at Higher Energy
title_short LHC Commissioning at Higher Energy
title_sort lhc commissioning at higher energy
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/2141759
work_keys_str_mv AT collierpaul lhccommissioningathigherenergy
AT bordryfrederick lhccommissioningathigherenergy
AT wenningerjorg lhccommissioningathigherenergy