Cargando…
LHC Commissioning at Higher Energy
The LHC has just come to the end of its first Long Shutdown (LS1) and preparations are underway to prepare for Run 2 data taking at 13 TeV centre of mass energy. After briefly recalling the major work undertaken during the 2-year long LS1, details will be given of the cool-down and hardware commissi...
Autores principales: | Collier, Paul, Bordry, Frederick, Wenninger, Jorg |
---|---|
Lenguaje: | eng |
Publicado: |
2015
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2141759 |
Ejemplares similares
-
Commissioning of the LHC superconducting magnet systems
por: Saban, Roberto, et al.
Publicado: (2008) -
The Commissioning of the LHC Test String 2
por: Bordry, Frederick, et al.
Publicado: (2001) -
Status of the LHC and HL-LHC
por: Bordry, Frederick
Publicado: (2016) -
Beam commissioning of injection into the LHC
por: Mertens, V, et al.
Publicado: (2009) -
Commissioning and Operation at Beta* = 1000 m in the LHC
por: Burkhardt, H, et al.
Publicado: (2013)