Cargando…
First Results From Beam Tests of the CLIC Drive Beam Phase Feedforward Prototype at CTF3
In the CLIC two beam acceleration scheme 100 MV/m normal conducting cavities are fed with RF power extracted from a secondary high power but low energy drive beam. To ensure the efficiency and luminosity performance of CLIC the phase synchronisation between the high energy main beam and the drive be...
Autores principales: | Roberts, Jack, Andersson, Alexandra, Burrows, Philip, Christian, Glenn, Corsini, Roberto, Ghigo, Andrea, Marcellini, Fabio, Perry, Colin, Skowroński, Piotr |
---|---|
Lenguaje: | eng |
Publicado: |
2015
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2141811 |
Ejemplares similares
-
First Experimental Results with the CLIC Drive Beam Phase Feedforward Prototype at the CLIC Test Facility CTF3
por: Christian, Glenn B, et al.
Publicado: (2016) -
Demonstration of CLIC Level Phase Stability using a High Bandwidth, Low Latency Drive Beam Phase Feedforward System at the CLIC Test Facility CTF3
por: Roberts, Jack, et al.
Publicado: (2016) -
Design, Hardware Tests and First Results From the CLIC Drive Beam Phase Feed-Forward Prototype at CTF3
por: Roberts, Jack, et al.
Publicado: (2014) -
Effect and Optimisation of Non-Linear Chromatic Aberrations of the CLIC Drive Beam Recombination at CTF3
por: Gamba, Davide, et al.
Publicado: (2016) -
Development of a Beam-based Phase Feedforward Demonstration at the CLIC Test Facility (CTF3)
por: Roberts, Jack
Publicado: (2017)