Cargando…
Considerations for the Beam Dump System of a 100 TeV Centre-of-mass FCC hh Collider
A 100 TeV centre-of-mass energy frontier proton collider in a new tunnel of 80–100 km circumference is a central part of CERN’s Future Circular Colliders (FCC) design study. One of the major challenges for such a machine will be the beam dump system, which for each ring will have to reliably abort p...
Autores principales: | , , , , , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2015
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2141846 |
_version_ | 1780950161332109312 |
---|---|
author | Kramer, Thomas Atanasov, Miroslav Barnes, Michael Bartmann, Wolfgang Borburgh, Jan Carlier, Etienne Cerutti, Francesco Ducimetière, Laurent Goddard, Brennan Lechner, Anton Losito, Roberto Steele, Genevieve Stoel, Linda Uythoven, Jan Velotti, Francesco |
author_facet | Kramer, Thomas Atanasov, Miroslav Barnes, Michael Bartmann, Wolfgang Borburgh, Jan Carlier, Etienne Cerutti, Francesco Ducimetière, Laurent Goddard, Brennan Lechner, Anton Losito, Roberto Steele, Genevieve Stoel, Linda Uythoven, Jan Velotti, Francesco |
author_sort | Kramer, Thomas |
collection | CERN |
description | A 100 TeV centre-of-mass energy frontier proton collider in a new tunnel of 80–100 km circumference is a central part of CERN’s Future Circular Colliders (FCC) design study. One of the major challenges for such a machine will be the beam dump system, which for each ring will have to reliably abort proton beams with stored energies in the range of 8 Gigajoule, more than an order of magnitude higher than planned for HL-LHC. The transverse proton beam energy densities are even more extreme, a factor of 100 above that of the presently operating LHC. The requirements for the beam dump subsystems are outlined, and the present technological limitations are described. First concepts for the beam dump system are presented and the feasibility is discussed, highlighting in particular the areas in which major technological progress will be needed. The potential implications on the overall machine and other key subsystems are described, including constraints on filling patterns, interlocking, beam intercepting devices and insertion design. |
id | oai-inspirehep.net-1417786 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2015 |
record_format | invenio |
spelling | oai-inspirehep.net-14177862022-08-10T12:59:28Zhttp://cds.cern.ch/record/2141846engKramer, ThomasAtanasov, MiroslavBarnes, MichaelBartmann, WolfgangBorburgh, JanCarlier, EtienneCerutti, FrancescoDucimetière, LaurentGoddard, BrennanLechner, AntonLosito, RobertoSteele, GenevieveStoel, LindaUythoven, JanVelotti, FrancescoConsiderations for the Beam Dump System of a 100 TeV Centre-of-mass FCC hh ColliderAccelerators and Storage RingsA 100 TeV centre-of-mass energy frontier proton collider in a new tunnel of 80–100 km circumference is a central part of CERN’s Future Circular Colliders (FCC) design study. One of the major challenges for such a machine will be the beam dump system, which for each ring will have to reliably abort proton beams with stored energies in the range of 8 Gigajoule, more than an order of magnitude higher than planned for HL-LHC. The transverse proton beam energy densities are even more extreme, a factor of 100 above that of the presently operating LHC. The requirements for the beam dump subsystems are outlined, and the present technological limitations are described. First concepts for the beam dump system are presented and the feasibility is discussed, highlighting in particular the areas in which major technological progress will be needed. The potential implications on the overall machine and other key subsystems are described, including constraints on filling patterns, interlocking, beam intercepting devices and insertion design.CERN-ACC-2015-269oai:inspirehep.net:14177862015 |
spellingShingle | Accelerators and Storage Rings Kramer, Thomas Atanasov, Miroslav Barnes, Michael Bartmann, Wolfgang Borburgh, Jan Carlier, Etienne Cerutti, Francesco Ducimetière, Laurent Goddard, Brennan Lechner, Anton Losito, Roberto Steele, Genevieve Stoel, Linda Uythoven, Jan Velotti, Francesco Considerations for the Beam Dump System of a 100 TeV Centre-of-mass FCC hh Collider |
title | Considerations for the Beam Dump System of a 100 TeV Centre-of-mass FCC hh Collider |
title_full | Considerations for the Beam Dump System of a 100 TeV Centre-of-mass FCC hh Collider |
title_fullStr | Considerations for the Beam Dump System of a 100 TeV Centre-of-mass FCC hh Collider |
title_full_unstemmed | Considerations for the Beam Dump System of a 100 TeV Centre-of-mass FCC hh Collider |
title_short | Considerations for the Beam Dump System of a 100 TeV Centre-of-mass FCC hh Collider |
title_sort | considerations for the beam dump system of a 100 tev centre-of-mass fcc hh collider |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/2141846 |
work_keys_str_mv | AT kramerthomas considerationsforthebeamdumpsystemofa100tevcentreofmassfcchhcollider AT atanasovmiroslav considerationsforthebeamdumpsystemofa100tevcentreofmassfcchhcollider AT barnesmichael considerationsforthebeamdumpsystemofa100tevcentreofmassfcchhcollider AT bartmannwolfgang considerationsforthebeamdumpsystemofa100tevcentreofmassfcchhcollider AT borburghjan considerationsforthebeamdumpsystemofa100tevcentreofmassfcchhcollider AT carlieretienne considerationsforthebeamdumpsystemofa100tevcentreofmassfcchhcollider AT ceruttifrancesco considerationsforthebeamdumpsystemofa100tevcentreofmassfcchhcollider AT ducimetierelaurent considerationsforthebeamdumpsystemofa100tevcentreofmassfcchhcollider AT goddardbrennan considerationsforthebeamdumpsystemofa100tevcentreofmassfcchhcollider AT lechneranton considerationsforthebeamdumpsystemofa100tevcentreofmassfcchhcollider AT lositoroberto considerationsforthebeamdumpsystemofa100tevcentreofmassfcchhcollider AT steelegenevieve considerationsforthebeamdumpsystemofa100tevcentreofmassfcchhcollider AT stoellinda considerationsforthebeamdumpsystemofa100tevcentreofmassfcchhcollider AT uythovenjan considerationsforthebeamdumpsystemofa100tevcentreofmassfcchhcollider AT velottifrancesco considerationsforthebeamdumpsystemofa100tevcentreofmassfcchhcollider |