Cargando…
Considerations for the Beam Dump System of a 100 TeV Centre-of-mass FCC hh Collider
A 100 TeV centre-of-mass energy frontier proton collider in a new tunnel of 80–100 km circumference is a central part of CERN’s Future Circular Colliders (FCC) design study. One of the major challenges for such a machine will be the beam dump system, which for each ring will have to reliably abort p...
Autores principales: | Kramer, Thomas, Atanasov, Miroslav, Barnes, Michael, Bartmann, Wolfgang, Borburgh, Jan, Carlier, Etienne, Cerutti, Francesco, Ducimetière, Laurent, Goddard, Brennan, Lechner, Anton, Losito, Roberto, Steele, Genevieve, Stoel, Linda, Uythoven, Jan, Velotti, Francesco |
---|---|
Lenguaje: | eng |
Publicado: |
2015
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2141846 |
Ejemplares similares
-
Optimization of the FCC-hh Beam Extraction System Regarding Failure Avoidance and Mitigation
por: Renner, Elisabeth, et al.
Publicado: (2018) -
Conceptual Design Considerations for the 50 TeV FCC Beam Dump Insertion
por: Burkart, Florian, et al.
Publicado: (2016) -
Design and evaluation of injection protection schemes for the FCC-hh injector options
por: Renner, Elisabeth, et al.
Publicado: (2018) -
Beam Transfer to the FCC-hh Collider from a 3.3 TeV Booster in the LHC Tunnel
por: Bartmann, Wolfgang, et al.
Publicado: (2015) -
Alternative proposal for FCC-hh extraction septa
por: Sanz Ull, Alejandro, et al.
Publicado: (2019)