Cargando…
Development and Production of Non-evaporable Getter Coatings for MAX IV
MAX IV is presently under construction at Lund, Sweden, and the first beam for the production of synchrotron radiation is expected to circulate in 2016. The whole set of 3-GeV ring beam pipes is coated with Ti-Zr-V Non Evaporable Getter (NEG) thin film in order to fulfil the average pressure require...
Autores principales: | Costa Pinto, Pedro, Ahlbäck, Jonny, Al-Dmour, Eshraq, Bártová, Barbora, Grabski, Marek, Holliger, Benjamin, Marques Dos Santos, Sergio, Nistor, Valentin, Pasquino, Chiara, Sapountzis, Antonios, Taborelli, Mauro, Wevers, Ivo |
---|---|
Lenguaje: | eng |
Publicado: |
2015
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2141883 |
Ejemplares similares
-
NEG Thin Film Coating Development for the MAX IV Vacuum System
por: Grabski, Marek, et al.
Publicado: (2013) -
Commissioning and operation status of the MAX IV 3 GeV storage ring vacuum system
por: Grabski, Marek, et al.
Publicado: (2021) -
Diffraction-limited storage-ring vacuum technology
por: Al-Dmour, Eshraq, et al.
Publicado: (2014) -
Development of copper electroformed vacuum chambers with integrated non-evaporable getter thin film coatings
por: Amadora, Lucia Lain, et al.
Publicado: (2017) -
The characterisation of non-evaporable getters by Auger electron spectroscopy: Analytical potential and artefacts
por: Scheuerlein, C, et al.
Publicado: (2002)