Cargando…
The clock and control system for the ATLAS Liquid Argon Calorimeter Phase-I upgrade
A Liquid-argon Trigger Digitizer Board (LTDB) is being developed to upgrade the ATLAS Liquid Argon Calorimeter Phase-I trigger electronics. The LTDB located at the front end needs to obtain the clock signals and be configured and monitored remotely from the back end. A clock and control system is be...
Autores principales: | , , , , , , , , , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2020
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1088/1748-0221/11/01/C01062 http://cds.cern.ch/record/2266409 |
_version_ | 1780954496525926400 |
---|---|
author | Xiao, Le Liu, Chonghan Liu, Tiankuan Chen, Hucheng Chen, Jinghong Chen, Kai Feng, Yulang Gong, Datao Guo, Di He, Huiqin Hou, Suen Huang, Guangming Sun, Xiangming Tang, Yuxuan Teng, Ping-Kun Xiang, Annie C. Xu, Hao Ye, Jingbo You, Yang |
author_facet | Xiao, Le Liu, Chonghan Liu, Tiankuan Chen, Hucheng Chen, Jinghong Chen, Kai Feng, Yulang Gong, Datao Guo, Di He, Huiqin Hou, Suen Huang, Guangming Sun, Xiangming Tang, Yuxuan Teng, Ping-Kun Xiang, Annie C. Xu, Hao Ye, Jingbo You, Yang |
author_sort | Xiao, Le |
collection | CERN |
description | A Liquid-argon Trigger Digitizer Board (LTDB) is being developed to upgrade the ATLAS Liquid Argon Calorimeter Phase-I trigger electronics. The LTDB located at the front end needs to obtain the clock signals and be configured and monitored remotely from the back end. A clock and control system is being developed for the LTDB and the major functions of the system have been evaluated. The design and evaluation of the clock and control system are presented in this paper. |
id | oai-inspirehep.net-1418399 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2020 |
record_format | invenio |
spelling | oai-inspirehep.net-14183992023-08-22T03:45:13Zdoi:10.1088/1748-0221/11/01/C01062http://cds.cern.ch/record/2266409engXiao, LeLiu, ChonghanLiu, TiankuanChen, HuchengChen, JinghongChen, KaiFeng, YulangGong, DataoGuo, DiHe, HuiqinHou, SuenHuang, GuangmingSun, XiangmingTang, YuxuanTeng, Ping-KunXiang, Annie C.Xu, HaoYe, JingboYou, YangThe clock and control system for the ATLAS Liquid Argon Calorimeter Phase-I upgradeDetectors and Experimental TechniquesA Liquid-argon Trigger Digitizer Board (LTDB) is being developed to upgrade the ATLAS Liquid Argon Calorimeter Phase-I trigger electronics. The LTDB located at the front end needs to obtain the clock signals and be configured and monitored remotely from the back end. A clock and control system is being developed for the LTDB and the major functions of the system have been evaluated. The design and evaluation of the clock and control system are presented in this paper.A Liquid-argon Trigger Digitizer Board (LTDB) is being developed to upgrade the ATLAS Liquid Argon Calorimeter Phase-I trigger electronics. The LTDB located at the front end needs to obtain the clock signals and be configured and monitored remotely from the back end. A clock and control system is being developed for the LTDB and the major functions of the system have been evaluated. The design and evaluation of the clock and control system are presented in this paper.arXiv:2009.08625oai:inspirehep.net:14183992020-09-18 |
spellingShingle | Detectors and Experimental Techniques Xiao, Le Liu, Chonghan Liu, Tiankuan Chen, Hucheng Chen, Jinghong Chen, Kai Feng, Yulang Gong, Datao Guo, Di He, Huiqin Hou, Suen Huang, Guangming Sun, Xiangming Tang, Yuxuan Teng, Ping-Kun Xiang, Annie C. Xu, Hao Ye, Jingbo You, Yang The clock and control system for the ATLAS Liquid Argon Calorimeter Phase-I upgrade |
title | The clock and control system for the ATLAS Liquid Argon Calorimeter Phase-I upgrade |
title_full | The clock and control system for the ATLAS Liquid Argon Calorimeter Phase-I upgrade |
title_fullStr | The clock and control system for the ATLAS Liquid Argon Calorimeter Phase-I upgrade |
title_full_unstemmed | The clock and control system for the ATLAS Liquid Argon Calorimeter Phase-I upgrade |
title_short | The clock and control system for the ATLAS Liquid Argon Calorimeter Phase-I upgrade |
title_sort | clock and control system for the atlas liquid argon calorimeter phase-i upgrade |
topic | Detectors and Experimental Techniques |
url | https://dx.doi.org/10.1088/1748-0221/11/01/C01062 http://cds.cern.ch/record/2266409 |
work_keys_str_mv | AT xiaole theclockandcontrolsystemfortheatlasliquidargoncalorimeterphaseiupgrade AT liuchonghan theclockandcontrolsystemfortheatlasliquidargoncalorimeterphaseiupgrade AT liutiankuan theclockandcontrolsystemfortheatlasliquidargoncalorimeterphaseiupgrade AT chenhucheng theclockandcontrolsystemfortheatlasliquidargoncalorimeterphaseiupgrade AT chenjinghong theclockandcontrolsystemfortheatlasliquidargoncalorimeterphaseiupgrade AT chenkai theclockandcontrolsystemfortheatlasliquidargoncalorimeterphaseiupgrade AT fengyulang theclockandcontrolsystemfortheatlasliquidargoncalorimeterphaseiupgrade AT gongdatao theclockandcontrolsystemfortheatlasliquidargoncalorimeterphaseiupgrade AT guodi theclockandcontrolsystemfortheatlasliquidargoncalorimeterphaseiupgrade AT hehuiqin theclockandcontrolsystemfortheatlasliquidargoncalorimeterphaseiupgrade AT housuen theclockandcontrolsystemfortheatlasliquidargoncalorimeterphaseiupgrade AT huangguangming theclockandcontrolsystemfortheatlasliquidargoncalorimeterphaseiupgrade AT sunxiangming theclockandcontrolsystemfortheatlasliquidargoncalorimeterphaseiupgrade AT tangyuxuan theclockandcontrolsystemfortheatlasliquidargoncalorimeterphaseiupgrade AT tengpingkun theclockandcontrolsystemfortheatlasliquidargoncalorimeterphaseiupgrade AT xianganniec theclockandcontrolsystemfortheatlasliquidargoncalorimeterphaseiupgrade AT xuhao theclockandcontrolsystemfortheatlasliquidargoncalorimeterphaseiupgrade AT yejingbo theclockandcontrolsystemfortheatlasliquidargoncalorimeterphaseiupgrade AT youyang theclockandcontrolsystemfortheatlasliquidargoncalorimeterphaseiupgrade AT xiaole clockandcontrolsystemfortheatlasliquidargoncalorimeterphaseiupgrade AT liuchonghan clockandcontrolsystemfortheatlasliquidargoncalorimeterphaseiupgrade AT liutiankuan clockandcontrolsystemfortheatlasliquidargoncalorimeterphaseiupgrade AT chenhucheng clockandcontrolsystemfortheatlasliquidargoncalorimeterphaseiupgrade AT chenjinghong clockandcontrolsystemfortheatlasliquidargoncalorimeterphaseiupgrade AT chenkai clockandcontrolsystemfortheatlasliquidargoncalorimeterphaseiupgrade AT fengyulang clockandcontrolsystemfortheatlasliquidargoncalorimeterphaseiupgrade AT gongdatao clockandcontrolsystemfortheatlasliquidargoncalorimeterphaseiupgrade AT guodi clockandcontrolsystemfortheatlasliquidargoncalorimeterphaseiupgrade AT hehuiqin clockandcontrolsystemfortheatlasliquidargoncalorimeterphaseiupgrade AT housuen clockandcontrolsystemfortheatlasliquidargoncalorimeterphaseiupgrade AT huangguangming clockandcontrolsystemfortheatlasliquidargoncalorimeterphaseiupgrade AT sunxiangming clockandcontrolsystemfortheatlasliquidargoncalorimeterphaseiupgrade AT tangyuxuan clockandcontrolsystemfortheatlasliquidargoncalorimeterphaseiupgrade AT tengpingkun clockandcontrolsystemfortheatlasliquidargoncalorimeterphaseiupgrade AT xianganniec clockandcontrolsystemfortheatlasliquidargoncalorimeterphaseiupgrade AT xuhao clockandcontrolsystemfortheatlasliquidargoncalorimeterphaseiupgrade AT yejingbo clockandcontrolsystemfortheatlasliquidargoncalorimeterphaseiupgrade AT youyang clockandcontrolsystemfortheatlasliquidargoncalorimeterphaseiupgrade |