Cargando…

The clock and control system for the ATLAS Liquid Argon Calorimeter Phase-I upgrade

A Liquid-argon Trigger Digitizer Board (LTDB) is being developed to upgrade the ATLAS Liquid Argon Calorimeter Phase-I trigger electronics. The LTDB located at the front end needs to obtain the clock signals and be configured and monitored remotely from the back end. A clock and control system is be...

Descripción completa

Detalles Bibliográficos
Autores principales: Xiao, Le, Liu, Chonghan, Liu, Tiankuan, Chen, Hucheng, Chen, Jinghong, Chen, Kai, Feng, Yulang, Gong, Datao, Guo, Di, He, Huiqin, Hou, Suen, Huang, Guangming, Sun, Xiangming, Tang, Yuxuan, Teng, Ping-Kun, Xiang, Annie C., Xu, Hao, Ye, Jingbo, You, Yang
Lenguaje:eng
Publicado: 2020
Materias:
Acceso en línea:https://dx.doi.org/10.1088/1748-0221/11/01/C01062
http://cds.cern.ch/record/2266409
_version_ 1780954496525926400
author Xiao, Le
Liu, Chonghan
Liu, Tiankuan
Chen, Hucheng
Chen, Jinghong
Chen, Kai
Feng, Yulang
Gong, Datao
Guo, Di
He, Huiqin
Hou, Suen
Huang, Guangming
Sun, Xiangming
Tang, Yuxuan
Teng, Ping-Kun
Xiang, Annie C.
Xu, Hao
Ye, Jingbo
You, Yang
author_facet Xiao, Le
Liu, Chonghan
Liu, Tiankuan
Chen, Hucheng
Chen, Jinghong
Chen, Kai
Feng, Yulang
Gong, Datao
Guo, Di
He, Huiqin
Hou, Suen
Huang, Guangming
Sun, Xiangming
Tang, Yuxuan
Teng, Ping-Kun
Xiang, Annie C.
Xu, Hao
Ye, Jingbo
You, Yang
author_sort Xiao, Le
collection CERN
description A Liquid-argon Trigger Digitizer Board (LTDB) is being developed to upgrade the ATLAS Liquid Argon Calorimeter Phase-I trigger electronics. The LTDB located at the front end needs to obtain the clock signals and be configured and monitored remotely from the back end. A clock and control system is being developed for the LTDB and the major functions of the system have been evaluated. The design and evaluation of the clock and control system are presented in this paper.
id oai-inspirehep.net-1418399
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2020
record_format invenio
spelling oai-inspirehep.net-14183992023-08-22T03:45:13Zdoi:10.1088/1748-0221/11/01/C01062http://cds.cern.ch/record/2266409engXiao, LeLiu, ChonghanLiu, TiankuanChen, HuchengChen, JinghongChen, KaiFeng, YulangGong, DataoGuo, DiHe, HuiqinHou, SuenHuang, GuangmingSun, XiangmingTang, YuxuanTeng, Ping-KunXiang, Annie C.Xu, HaoYe, JingboYou, YangThe clock and control system for the ATLAS Liquid Argon Calorimeter Phase-I upgradeDetectors and Experimental TechniquesA Liquid-argon Trigger Digitizer Board (LTDB) is being developed to upgrade the ATLAS Liquid Argon Calorimeter Phase-I trigger electronics. The LTDB located at the front end needs to obtain the clock signals and be configured and monitored remotely from the back end. A clock and control system is being developed for the LTDB and the major functions of the system have been evaluated. The design and evaluation of the clock and control system are presented in this paper.A Liquid-argon Trigger Digitizer Board (LTDB) is being developed to upgrade the ATLAS Liquid Argon Calorimeter Phase-I trigger electronics. The LTDB located at the front end needs to obtain the clock signals and be configured and monitored remotely from the back end. A clock and control system is being developed for the LTDB and the major functions of the system have been evaluated. The design and evaluation of the clock and control system are presented in this paper.arXiv:2009.08625oai:inspirehep.net:14183992020-09-18
spellingShingle Detectors and Experimental Techniques
Xiao, Le
Liu, Chonghan
Liu, Tiankuan
Chen, Hucheng
Chen, Jinghong
Chen, Kai
Feng, Yulang
Gong, Datao
Guo, Di
He, Huiqin
Hou, Suen
Huang, Guangming
Sun, Xiangming
Tang, Yuxuan
Teng, Ping-Kun
Xiang, Annie C.
Xu, Hao
Ye, Jingbo
You, Yang
The clock and control system for the ATLAS Liquid Argon Calorimeter Phase-I upgrade
title The clock and control system for the ATLAS Liquid Argon Calorimeter Phase-I upgrade
title_full The clock and control system for the ATLAS Liquid Argon Calorimeter Phase-I upgrade
title_fullStr The clock and control system for the ATLAS Liquid Argon Calorimeter Phase-I upgrade
title_full_unstemmed The clock and control system for the ATLAS Liquid Argon Calorimeter Phase-I upgrade
title_short The clock and control system for the ATLAS Liquid Argon Calorimeter Phase-I upgrade
title_sort clock and control system for the atlas liquid argon calorimeter phase-i upgrade
topic Detectors and Experimental Techniques
url https://dx.doi.org/10.1088/1748-0221/11/01/C01062
http://cds.cern.ch/record/2266409
work_keys_str_mv AT xiaole theclockandcontrolsystemfortheatlasliquidargoncalorimeterphaseiupgrade
AT liuchonghan theclockandcontrolsystemfortheatlasliquidargoncalorimeterphaseiupgrade
AT liutiankuan theclockandcontrolsystemfortheatlasliquidargoncalorimeterphaseiupgrade
AT chenhucheng theclockandcontrolsystemfortheatlasliquidargoncalorimeterphaseiupgrade
AT chenjinghong theclockandcontrolsystemfortheatlasliquidargoncalorimeterphaseiupgrade
AT chenkai theclockandcontrolsystemfortheatlasliquidargoncalorimeterphaseiupgrade
AT fengyulang theclockandcontrolsystemfortheatlasliquidargoncalorimeterphaseiupgrade
AT gongdatao theclockandcontrolsystemfortheatlasliquidargoncalorimeterphaseiupgrade
AT guodi theclockandcontrolsystemfortheatlasliquidargoncalorimeterphaseiupgrade
AT hehuiqin theclockandcontrolsystemfortheatlasliquidargoncalorimeterphaseiupgrade
AT housuen theclockandcontrolsystemfortheatlasliquidargoncalorimeterphaseiupgrade
AT huangguangming theclockandcontrolsystemfortheatlasliquidargoncalorimeterphaseiupgrade
AT sunxiangming theclockandcontrolsystemfortheatlasliquidargoncalorimeterphaseiupgrade
AT tangyuxuan theclockandcontrolsystemfortheatlasliquidargoncalorimeterphaseiupgrade
AT tengpingkun theclockandcontrolsystemfortheatlasliquidargoncalorimeterphaseiupgrade
AT xianganniec theclockandcontrolsystemfortheatlasliquidargoncalorimeterphaseiupgrade
AT xuhao theclockandcontrolsystemfortheatlasliquidargoncalorimeterphaseiupgrade
AT yejingbo theclockandcontrolsystemfortheatlasliquidargoncalorimeterphaseiupgrade
AT youyang theclockandcontrolsystemfortheatlasliquidargoncalorimeterphaseiupgrade
AT xiaole clockandcontrolsystemfortheatlasliquidargoncalorimeterphaseiupgrade
AT liuchonghan clockandcontrolsystemfortheatlasliquidargoncalorimeterphaseiupgrade
AT liutiankuan clockandcontrolsystemfortheatlasliquidargoncalorimeterphaseiupgrade
AT chenhucheng clockandcontrolsystemfortheatlasliquidargoncalorimeterphaseiupgrade
AT chenjinghong clockandcontrolsystemfortheatlasliquidargoncalorimeterphaseiupgrade
AT chenkai clockandcontrolsystemfortheatlasliquidargoncalorimeterphaseiupgrade
AT fengyulang clockandcontrolsystemfortheatlasliquidargoncalorimeterphaseiupgrade
AT gongdatao clockandcontrolsystemfortheatlasliquidargoncalorimeterphaseiupgrade
AT guodi clockandcontrolsystemfortheatlasliquidargoncalorimeterphaseiupgrade
AT hehuiqin clockandcontrolsystemfortheatlasliquidargoncalorimeterphaseiupgrade
AT housuen clockandcontrolsystemfortheatlasliquidargoncalorimeterphaseiupgrade
AT huangguangming clockandcontrolsystemfortheatlasliquidargoncalorimeterphaseiupgrade
AT sunxiangming clockandcontrolsystemfortheatlasliquidargoncalorimeterphaseiupgrade
AT tangyuxuan clockandcontrolsystemfortheatlasliquidargoncalorimeterphaseiupgrade
AT tengpingkun clockandcontrolsystemfortheatlasliquidargoncalorimeterphaseiupgrade
AT xianganniec clockandcontrolsystemfortheatlasliquidargoncalorimeterphaseiupgrade
AT xuhao clockandcontrolsystemfortheatlasliquidargoncalorimeterphaseiupgrade
AT yejingbo clockandcontrolsystemfortheatlasliquidargoncalorimeterphaseiupgrade
AT youyang clockandcontrolsystemfortheatlasliquidargoncalorimeterphaseiupgrade