Cargando…
Considerations on the Fast Pulsed Magnet Systems for the 2 GeV Beam Transfer from the CERN PSB to PS
Within the scope of the LIU project the CERN PS Booster to PS beam transfer will be modified to match the requirements for the future 2 GeV proton beam energy upgrade. The paper describes considerations on the PSB extraction and recombination kickers as well as on the injection kicker(s) into the PS...
Autores principales: | Kramer, Thomas, Abelleira, Jose Luis, Bartmann, Wolfgang, Borburgh, Jan, Ducimetière, Laurent, Feliciano, Luis, Goddard, Brennan, Sermeus, Luc |
---|---|
Lenguaje: | eng |
Publicado: |
2015
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2141894 |
Ejemplares similares
-
Performance of the PS Injection Kicker System Short Circuit Mode Upgrade for Operation with 2 GeV LIU Beams
por: Kramer, Thomas, et al.
Publicado: (2017) -
Feasibility Study of the PS Injection for 2 GeV LIU Beams with an Upgraded KFA-45 Injection Kicker System Operating in Short Circuit Mode
por: Kramer, Thomas, et al.
Publicado: (2016) -
Upgrades for the CERN PSB-to-PS Transfer at 2 GeV
por: Bartmann, W, et al.
Publicado: (2013) -
New PSB H$^{−}$ Injection and 2 GeV Transfer to the CERN PS
por: Bartmann, Wolfgang, et al.
Publicado: (2015) -
Injection and Extraction Considerations for a 2 GeV RCS at CERN
por: Bartmann, W, et al.
Publicado: (2011)