Beam Commissioning of Linac4 up to 12 MeV

CERN Linac4 is made of a 3 MeV front end including a 45 keV source , a 3 MeV Radio Frequency Quadrupole (RFQ) and a fast chopper, followed by a 50 MeV Drift Tube Linac (DTL), a 100 MeV Cell-Coupled Drift Tube Linac (CCDTL) and a 160 MeV Pi-Mode Structure (PIMS). The Linac4 beam commissioning is perf...

Descripción completa

Detalles Bibliográficos
Autores principales: Dimov, Veliko, Belli, Eleonora, Bellodi, Giulia, Lallement, Jean-Baptiste, Lombardi, Alessandra, Yarmohammadi Satri, Masoomeh
Lenguaje:eng
Publicado: 2015
Materias:
Acceso en línea:http://cds.cern.ch/record/2141897
_version_ 1780950172755296256
author Dimov, Veliko
Belli, Eleonora
Bellodi, Giulia
Lallement, Jean-Baptiste
Lombardi, Alessandra
Yarmohammadi Satri, Masoomeh
author_facet Dimov, Veliko
Belli, Eleonora
Bellodi, Giulia
Lallement, Jean-Baptiste
Lombardi, Alessandra
Yarmohammadi Satri, Masoomeh
author_sort Dimov, Veliko
collection CERN
description CERN Linac4 is made of a 3 MeV front end including a 45 keV source , a 3 MeV Radio Frequency Quadrupole (RFQ) and a fast chopper, followed by a 50 MeV Drift Tube Linac (DTL), a 100 MeV Cell-Coupled Drift Tube Linac (CCDTL) and a 160 MeV Pi-Mode Structure (PIMS). The Linac4 beam commissioning is performed in 6 stages of increasing energy. Movable beam diagnostics benches, with various instruments, are used at each step to allow the detailed characterisation of operational parameters that will play a key role in the overall future performance. The first three stages of the commissioning, up to 12 MeV beam energy, have been completed at the end of 2014. The RFQ and the chopper line at 3 MeV, as well as the first tank of the DTL at 12 MeV were fully characterised, using permanent diagnostic instruments and a movable diagnostic bench equipped with a spectrometer, a slit-grid emittance meter, a Bunch Shape Monitor, Beam Position Monitors and a laser-emittance device. This paper reports on the strategy and the results of the commissioning up to 12 MeV. It also presents the validation of the set-up strategy, which is essential for the next stages of commissioning.
id oai-inspirehep.net-1418689
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2015
record_format invenio
spelling oai-inspirehep.net-14186892022-08-10T12:59:34Zhttp://cds.cern.ch/record/2141897engDimov, VelikoBelli, EleonoraBellodi, GiuliaLallement, Jean-BaptisteLombardi, AlessandraYarmohammadi Satri, MasoomehBeam Commissioning of Linac4 up to 12 MeVAccelerators and Storage RingsCERN Linac4 is made of a 3 MeV front end including a 45 keV source , a 3 MeV Radio Frequency Quadrupole (RFQ) and a fast chopper, followed by a 50 MeV Drift Tube Linac (DTL), a 100 MeV Cell-Coupled Drift Tube Linac (CCDTL) and a 160 MeV Pi-Mode Structure (PIMS). The Linac4 beam commissioning is performed in 6 stages of increasing energy. Movable beam diagnostics benches, with various instruments, are used at each step to allow the detailed characterisation of operational parameters that will play a key role in the overall future performance. The first three stages of the commissioning, up to 12 MeV beam energy, have been completed at the end of 2014. The RFQ and the chopper line at 3 MeV, as well as the first tank of the DTL at 12 MeV were fully characterised, using permanent diagnostic instruments and a movable diagnostic bench equipped with a spectrometer, a slit-grid emittance meter, a Bunch Shape Monitor, Beam Position Monitors and a laser-emittance device. This paper reports on the strategy and the results of the commissioning up to 12 MeV. It also presents the validation of the set-up strategy, which is essential for the next stages of commissioning.CERN-ACC-2015-016oai:inspirehep.net:14186892015
spellingShingle Accelerators and Storage Rings
Dimov, Veliko
Belli, Eleonora
Bellodi, Giulia
Lallement, Jean-Baptiste
Lombardi, Alessandra
Yarmohammadi Satri, Masoomeh
Beam Commissioning of Linac4 up to 12 MeV
title Beam Commissioning of Linac4 up to 12 MeV
title_full Beam Commissioning of Linac4 up to 12 MeV
title_fullStr Beam Commissioning of Linac4 up to 12 MeV
title_full_unstemmed Beam Commissioning of Linac4 up to 12 MeV
title_short Beam Commissioning of Linac4 up to 12 MeV
title_sort beam commissioning of linac4 up to 12 mev
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/2141897
work_keys_str_mv AT dimovveliko beamcommissioningoflinac4upto12mev
AT bellieleonora beamcommissioningoflinac4upto12mev
AT bellodigiulia beamcommissioningoflinac4upto12mev
AT lallementjeanbaptiste beamcommissioningoflinac4upto12mev
AT lombardialessandra beamcommissioningoflinac4upto12mev
AT yarmohammadisatrimasoomeh beamcommissioningoflinac4upto12mev