Cargando…
Beam Commissioning of Linac4 up to 12 MeV
CERN Linac4 is made of a 3 MeV front end including a 45 keV source , a 3 MeV Radio Frequency Quadrupole (RFQ) and a fast chopper, followed by a 50 MeV Drift Tube Linac (DTL), a 100 MeV Cell-Coupled Drift Tube Linac (CCDTL) and a 160 MeV Pi-Mode Structure (PIMS). The Linac4 beam commissioning is perf...
Autores principales: | Dimov, Veliko, Belli, Eleonora, Bellodi, Giulia, Lallement, Jean-Baptiste, Lombardi, Alessandra, Yarmohammadi Satri, Masoomeh |
---|---|
Lenguaje: | eng |
Publicado: |
2015
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2141897 |
Ejemplares similares
-
Longitudinal Beam Profile Measurements in Linac4 Commissioning
por: Bellodi, Giulia, et al.
Publicado: (2014) -
Linac4 Transverse and Longitudinal Emittance Reconstruction in the Presence of Space Charge
por: Lallement, Jean-Baptiste, et al.
Publicado: (2014) -
Transverse Beam Profile Measurements in the Linac4 Medium Energy Beam Transport
por: Yarmohammadi Satri, Masoomeh, et al.
Publicado: (2014) -
Emittance reconstruction techniques in presence of space charge applied during the Linac4 beam commissioning
por: Dimov, Veliko, et al.
Publicado: (2016) -
First commissioning experience with the LINAC4 3 MeV front-end at CERN
por: Lallement, J B, et al.
Publicado: (2013)