Feasibility Study of a New SPS Beam Dump System
The CERN Super Proton Synchrotron (SPS) presently uses an internal beam dump system with two separate blocks to cleanly dispose of low and high energy beams. In view of the increased beam power and brightness needed for the LHC Injector Upgrade project for High Luminosity LHC (HL-LHC), the performan...
Autores principales: | , , , , , , , , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2015
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2141908 |
_version_ | 1780950175127175168 |
---|---|
author | Velotti, Francesco Abelleira, Jose Luis Barnes, Michael Bracco, Chiara Carlier, Etienne Cerutti, Francesco Cornelis, Karel Folch, Ramon Goddard, Brennan Kain, Verena Meddahi, Malika Morton, Richard Osborne, John Pasdeloup, Florian Senaj, Viliam Steele, Genevieve Uythoven, Jan Vincke, Helmut |
author_facet | Velotti, Francesco Abelleira, Jose Luis Barnes, Michael Bracco, Chiara Carlier, Etienne Cerutti, Francesco Cornelis, Karel Folch, Ramon Goddard, Brennan Kain, Verena Meddahi, Malika Morton, Richard Osborne, John Pasdeloup, Florian Senaj, Viliam Steele, Genevieve Uythoven, Jan Vincke, Helmut |
author_sort | Velotti, Francesco |
collection | CERN |
description | The CERN Super Proton Synchrotron (SPS) presently uses an internal beam dump system with two separate blocks to cleanly dispose of low and high energy beams. In view of the increased beam power and brightness needed for the LHC Injector Upgrade project for High Luminosity LHC (HL-LHC), the performance of this internal beam dump system has been reviewed for future operation. Different possible upgrades of the beam dumping system have been investigated. The initially considered solution for the SPS Beam Dump System is to design a new, dedicated external system, with a dump block in a shielded cavern separated from the machine ring. Unfortunately this solution is not feasible with the present technology. In this paper, the design requirements and the possible solutions are investigated, including considering a new internal beam dump in the Long Straight Section 5 (LSS5). |
id | oai-inspirehep.net-1418701 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2015 |
record_format | invenio |
spelling | oai-inspirehep.net-14187012022-08-10T12:59:35Zhttp://cds.cern.ch/record/2141908engVelotti, FrancescoAbelleira, Jose LuisBarnes, MichaelBracco, ChiaraCarlier, EtienneCerutti, FrancescoCornelis, KarelFolch, RamonGoddard, BrennanKain, VerenaMeddahi, MalikaMorton, RichardOsborne, JohnPasdeloup, FlorianSenaj, ViliamSteele, GenevieveUythoven, JanVincke, HelmutFeasibility Study of a New SPS Beam Dump SystemAccelerators and Storage RingsThe CERN Super Proton Synchrotron (SPS) presently uses an internal beam dump system with two separate blocks to cleanly dispose of low and high energy beams. In view of the increased beam power and brightness needed for the LHC Injector Upgrade project for High Luminosity LHC (HL-LHC), the performance of this internal beam dump system has been reviewed for future operation. Different possible upgrades of the beam dumping system have been investigated. The initially considered solution for the SPS Beam Dump System is to design a new, dedicated external system, with a dump block in a shielded cavern separated from the machine ring. Unfortunately this solution is not feasible with the present technology. In this paper, the design requirements and the possible solutions are investigated, including considering a new internal beam dump in the Long Straight Section 5 (LSS5).CERN-ACC-2015-005oai:inspirehep.net:14187012015 |
spellingShingle | Accelerators and Storage Rings Velotti, Francesco Abelleira, Jose Luis Barnes, Michael Bracco, Chiara Carlier, Etienne Cerutti, Francesco Cornelis, Karel Folch, Ramon Goddard, Brennan Kain, Verena Meddahi, Malika Morton, Richard Osborne, John Pasdeloup, Florian Senaj, Viliam Steele, Genevieve Uythoven, Jan Vincke, Helmut Feasibility Study of a New SPS Beam Dump System |
title | Feasibility Study of a New SPS Beam Dump System |
title_full | Feasibility Study of a New SPS Beam Dump System |
title_fullStr | Feasibility Study of a New SPS Beam Dump System |
title_full_unstemmed | Feasibility Study of a New SPS Beam Dump System |
title_short | Feasibility Study of a New SPS Beam Dump System |
title_sort | feasibility study of a new sps beam dump system |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/2141908 |
work_keys_str_mv | AT velottifrancesco feasibilitystudyofanewspsbeamdumpsystem AT abelleirajoseluis feasibilitystudyofanewspsbeamdumpsystem AT barnesmichael feasibilitystudyofanewspsbeamdumpsystem AT braccochiara feasibilitystudyofanewspsbeamdumpsystem AT carlieretienne feasibilitystudyofanewspsbeamdumpsystem AT ceruttifrancesco feasibilitystudyofanewspsbeamdumpsystem AT corneliskarel feasibilitystudyofanewspsbeamdumpsystem AT folchramon feasibilitystudyofanewspsbeamdumpsystem AT goddardbrennan feasibilitystudyofanewspsbeamdumpsystem AT kainverena feasibilitystudyofanewspsbeamdumpsystem AT meddahimalika feasibilitystudyofanewspsbeamdumpsystem AT mortonrichard feasibilitystudyofanewspsbeamdumpsystem AT osbornejohn feasibilitystudyofanewspsbeamdumpsystem AT pasdeloupflorian feasibilitystudyofanewspsbeamdumpsystem AT senajviliam feasibilitystudyofanewspsbeamdumpsystem AT steelegenevieve feasibilitystudyofanewspsbeamdumpsystem AT uythovenjan feasibilitystudyofanewspsbeamdumpsystem AT vinckehelmut feasibilitystudyofanewspsbeamdumpsystem |