Cargando…

Performance simulation studies for the ALICE TPC GEM upgrade

To be able to exploit the anticipated interaction rate of 50 kHz in Pb–Pb collisions during run 3 of the LHC (beyond 2019), the ALICE TPC will be upgraded to allow continuous readout. As this is not possible with the current Multi Wire Proportional Chamber (MWPC) based amplification, the readout wil...

Descripción completa

Detalles Bibliográficos
Autor principal: Ljunggren, M
Lenguaje:eng
Publicado: 2016
Materias:
Acceso en línea:https://dx.doi.org/10.1016/j.nima.2015.12.059
http://cds.cern.ch/record/2267906