Cargando…

Beam Instrumentation Performance during Commissioning of CERN's Linac-4 to 50 MeV and 100 MeV

Linac-4, a 140 MeV H-linear accelerator is designed to replace the aging 50 MeV proton Linac. It will consist of an H-source and 45 keV LEBT, an RFQ and 3 MeV MEBT with a chopper, 3 drift tube linac (DTL) tanks accelerating the beam to 12, 30 and 50 Mev, cavity coupled structures (CCDTL) acceleratin...

Descripción completa

Detalles Bibliográficos
Autores principales: Raich, Uli, Hofmann, Thomas, Roncarolo, Federico
Lenguaje:eng
Publicado: 2016
Materias:
Acceso en línea:https://dx.doi.org/10.18429/JACoW-IPAC2016-MOPMR026
http://cds.cern.ch/record/2207312
_version_ 1780951672557666304
author Raich, Uli
Hofmann, Thomas
Roncarolo, Federico
author_facet Raich, Uli
Hofmann, Thomas
Roncarolo, Federico
author_sort Raich, Uli
collection CERN
description Linac-4, a 140 MeV H-linear accelerator is designed to replace the aging 50 MeV proton Linac. It will consist of an H-source and 45 keV LEBT, an RFQ and 3 MeV MEBT with a chopper, 3 drift tube linac (DTL) tanks accelerating the beam to 12, 30 and 50 Mev, cavity coupled structures (CCDTL) accelerating it to 100 MeV and a pi mode structure bringing it to its design energy of 160 MeV. This paper reports on the commissioning of the DTL and CCDTL with 2 dedicated temporary measurement lines, the first one adapted to the 12 MeV beam while the second one is dedicated to characterize the 50 MeV and the 100 MeV beams. The beam diagnostic devices used in these lines is described as well as results obtained.
id oai-inspirehep.net-1469587
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2016
record_format invenio
spelling oai-inspirehep.net-14695872022-08-10T12:47:03Zdoi:10.18429/JACoW-IPAC2016-MOPMR026http://cds.cern.ch/record/2207312engRaich, UliHofmann, ThomasRoncarolo, FedericoBeam Instrumentation Performance during Commissioning of CERN's Linac-4 to 50 MeV and 100 MeVAccelerators and Storage RingsLinac-4, a 140 MeV H-linear accelerator is designed to replace the aging 50 MeV proton Linac. It will consist of an H-source and 45 keV LEBT, an RFQ and 3 MeV MEBT with a chopper, 3 drift tube linac (DTL) tanks accelerating the beam to 12, 30 and 50 Mev, cavity coupled structures (CCDTL) accelerating it to 100 MeV and a pi mode structure bringing it to its design energy of 160 MeV. This paper reports on the commissioning of the DTL and CCDTL with 2 dedicated temporary measurement lines, the first one adapted to the 12 MeV beam while the second one is dedicated to characterize the 50 MeV and the 100 MeV beams. The beam diagnostic devices used in these lines is described as well as results obtained.CERN-ACC-2016-313oai:inspirehep.net:14695872016
spellingShingle Accelerators and Storage Rings
Raich, Uli
Hofmann, Thomas
Roncarolo, Federico
Beam Instrumentation Performance during Commissioning of CERN's Linac-4 to 50 MeV and 100 MeV
title Beam Instrumentation Performance during Commissioning of CERN's Linac-4 to 50 MeV and 100 MeV
title_full Beam Instrumentation Performance during Commissioning of CERN's Linac-4 to 50 MeV and 100 MeV
title_fullStr Beam Instrumentation Performance during Commissioning of CERN's Linac-4 to 50 MeV and 100 MeV
title_full_unstemmed Beam Instrumentation Performance during Commissioning of CERN's Linac-4 to 50 MeV and 100 MeV
title_short Beam Instrumentation Performance during Commissioning of CERN's Linac-4 to 50 MeV and 100 MeV
title_sort beam instrumentation performance during commissioning of cern's linac-4 to 50 mev and 100 mev
topic Accelerators and Storage Rings
url https://dx.doi.org/10.18429/JACoW-IPAC2016-MOPMR026
http://cds.cern.ch/record/2207312
work_keys_str_mv AT raichuli beaminstrumentationperformanceduringcommissioningofcernslinac4to50mevand100mev
AT hofmannthomas beaminstrumentationperformanceduringcommissioningofcernslinac4to50mevand100mev
AT roncarolofederico beaminstrumentationperformanceduringcommissioningofcernslinac4to50mevand100mev