Cargando…
LHC Injectors Upgrade (LIU) Project at CERN
A massive improvement program of the LHC injector chain is presently being conducted under the LIU project. For the proton chain, this includes the replacement of Linac2 with Linac4 as well as all necessary upgrades to the Proton Synchrotron Booster (PSB), the Proton Synchrotron (PS) and Super Proto...
Autores principales: | , , , , , , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2016
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IPAC2016-MOPOY059 http://cds.cern.ch/record/2207337 |
_version_ | 1780951678019698688 |
---|---|
author | Shaposhnikova, Elena Coupard, Julie Damerau, Heiko Funken, Anne Gilardoni, Simone Goddard, Brennan Hanke, Klaus Kobzeva, Lelyzaveta Lombardi, Alessandra Manglunki, Django Mataguez, Simon Meddahi, Malika Mikulec, Bettina Rumolo, Giovanni Scrivens, Richard Vretenar, Maurizio |
author_facet | Shaposhnikova, Elena Coupard, Julie Damerau, Heiko Funken, Anne Gilardoni, Simone Goddard, Brennan Hanke, Klaus Kobzeva, Lelyzaveta Lombardi, Alessandra Manglunki, Django Mataguez, Simon Meddahi, Malika Mikulec, Bettina Rumolo, Giovanni Scrivens, Richard Vretenar, Maurizio |
author_sort | Shaposhnikova, Elena |
collection | CERN |
description | A massive improvement program of the LHC injector chain is presently being conducted under the LIU project. For the proton chain, this includes the replacement of Linac2 with Linac4 as well as all necessary upgrades to the Proton Synchrotron Booster (PSB), the Proton Synchrotron (PS) and Super Proton Synchrotron (SPS), aimed at producing beams with the challenging High Luminosity LHC (HL-LHC) parameters. Regarding the heavy ions, plans to improve the performance of Linac3 and the Low Energy Ion Ring (LEIR) are also pursued under the general LIU program. The full LHC injection chain returned to operation after Long Shutdown 1, with extended beam studies taking place in Run 2. A general project Cost and Schedule Review also took place in March 2015, and several dedicated LIU project reviews were held to address issues awaiting pending decisions. In view of these developments, 2014 and 2015 have been key years to define a number of important aspects of the final LIU path. This paper will describe the reviewed LIU roadmap and revised performance objectives of the main upgrades, including the work status and outlook in terms of the required installation and commissioning stages. |
id | oai-inspirehep.net-1469790 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2016 |
record_format | invenio |
spelling | oai-inspirehep.net-14697902022-08-10T12:47:48Zdoi:10.18429/JACoW-IPAC2016-MOPOY059http://cds.cern.ch/record/2207337engShaposhnikova, ElenaCoupard, JulieDamerau, HeikoFunken, AnneGilardoni, SimoneGoddard, BrennanHanke, KlausKobzeva, LelyzavetaLombardi, AlessandraManglunki, DjangoMataguez, SimonMeddahi, MalikaMikulec, BettinaRumolo, GiovanniScrivens, RichardVretenar, MaurizioLHC Injectors Upgrade (LIU) Project at CERNAccelerators and Storage RingsA massive improvement program of the LHC injector chain is presently being conducted under the LIU project. For the proton chain, this includes the replacement of Linac2 with Linac4 as well as all necessary upgrades to the Proton Synchrotron Booster (PSB), the Proton Synchrotron (PS) and Super Proton Synchrotron (SPS), aimed at producing beams with the challenging High Luminosity LHC (HL-LHC) parameters. Regarding the heavy ions, plans to improve the performance of Linac3 and the Low Energy Ion Ring (LEIR) are also pursued under the general LIU program. The full LHC injection chain returned to operation after Long Shutdown 1, with extended beam studies taking place in Run 2. A general project Cost and Schedule Review also took place in March 2015, and several dedicated LIU project reviews were held to address issues awaiting pending decisions. In view of these developments, 2014 and 2015 have been key years to define a number of important aspects of the final LIU path. This paper will describe the reviewed LIU roadmap and revised performance objectives of the main upgrades, including the work status and outlook in terms of the required installation and commissioning stages.CERN-ACC-2016-288oai:inspirehep.net:14697902016 |
spellingShingle | Accelerators and Storage Rings Shaposhnikova, Elena Coupard, Julie Damerau, Heiko Funken, Anne Gilardoni, Simone Goddard, Brennan Hanke, Klaus Kobzeva, Lelyzaveta Lombardi, Alessandra Manglunki, Django Mataguez, Simon Meddahi, Malika Mikulec, Bettina Rumolo, Giovanni Scrivens, Richard Vretenar, Maurizio LHC Injectors Upgrade (LIU) Project at CERN |
title | LHC Injectors Upgrade (LIU) Project at CERN |
title_full | LHC Injectors Upgrade (LIU) Project at CERN |
title_fullStr | LHC Injectors Upgrade (LIU) Project at CERN |
title_full_unstemmed | LHC Injectors Upgrade (LIU) Project at CERN |
title_short | LHC Injectors Upgrade (LIU) Project at CERN |
title_sort | lhc injectors upgrade (liu) project at cern |
topic | Accelerators and Storage Rings |
url | https://dx.doi.org/10.18429/JACoW-IPAC2016-MOPOY059 http://cds.cern.ch/record/2207337 |
work_keys_str_mv | AT shaposhnikovaelena lhcinjectorsupgradeliuprojectatcern AT coupardjulie lhcinjectorsupgradeliuprojectatcern AT damerauheiko lhcinjectorsupgradeliuprojectatcern AT funkenanne lhcinjectorsupgradeliuprojectatcern AT gilardonisimone lhcinjectorsupgradeliuprojectatcern AT goddardbrennan lhcinjectorsupgradeliuprojectatcern AT hankeklaus lhcinjectorsupgradeliuprojectatcern AT kobzevalelyzaveta lhcinjectorsupgradeliuprojectatcern AT lombardialessandra lhcinjectorsupgradeliuprojectatcern AT manglunkidjango lhcinjectorsupgradeliuprojectatcern AT mataguezsimon lhcinjectorsupgradeliuprojectatcern AT meddahimalika lhcinjectorsupgradeliuprojectatcern AT mikulecbettina lhcinjectorsupgradeliuprojectatcern AT rumologiovanni lhcinjectorsupgradeliuprojectatcern AT scrivensrichard lhcinjectorsupgradeliuprojectatcern AT vretenarmaurizio lhcinjectorsupgradeliuprojectatcern |