Cargando…
CERN AWAKE Facility Readiness for First Beam
The AWAKE project at CERN was approved in August 2013 and since then a big effort was made to be able to probe the acceleration of electrons before the "2019-2020 Long Shutdown". The next steps in this challenging schedule will be a dry run of all the beam line systems, at the end of the H...
Autores principales: | Bracco, Chiara, Bernardini, Marzia, Butterworth, Andrew, Damerau, Heiko, Döbert, Steffen, Fedosseev, Valentin, Feldbaumer, Eduard, Gschwendtner, Edda, Höfle, Wolfgang, Pardons, Ans, Shaposhnikova, Elena, Vincke, Helmut |
---|---|
Lenguaje: | eng |
Publicado: |
2016
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IPAC2016-TUOBB03 http://cds.cern.ch/record/2207338 |
Ejemplares similares
-
Awake: the Proof-of-principle R&D; Experiment at CERN
por: Muggli, Patric, et al.
Publicado: (2015) -
The AWAKE Experimental Facility at CERN
por: Gschwendtner, E, et al.
Publicado: (2014) -
Beam studies and experimental facility for the AWAKE experiment at CERN
por: Bracco, Chiara, et al.
Publicado: (2014) -
Feasibility Study of the Awake Facility at CERN
por: Gschwendtner, E, et al.
Publicado: (2013) -
AWAKE Proton Beam Commissioning
por: Schmidt, Janet, et al.
Publicado: (2017)