Cargando…

Commissioning Preparation of the AWAKE Proton Beam Line

The AWAKE experiment at CERN will use a proton bunch with an momentum of 400 GeV/c from the SPS to drive large amplitude wakefields in a plasma. This will require a ~830 m long transfer line from the SPS to the experiment. The prepa- rations for the beam commissioning of the AWAKE proton transfer li...

Descripción completa

Detalles Bibliográficos
Autores principales: Schmidt, Janet, Biskup, Bartolomej, Bracco, Chiara, Goddard, Brennan, Gorbonosov, Roman, Gourber-Pace, Marine, Gschwendtner, Edda, Jensen, Lars, Jones, Owain Rhodri, Kain, Verena, Mazzoni, Stefano, Meddahi, Malika
Lenguaje:eng
Publicado: 2016
Materias:
Acceso en línea:https://dx.doi.org/10.18429/JACoW-IPAC2016-TUPMR052
http://cds.cern.ch/record/2207356
_version_ 1780951682147942400
author Schmidt, Janet
Biskup, Bartolomej
Bracco, Chiara
Goddard, Brennan
Gorbonosov, Roman
Gourber-Pace, Marine
Gschwendtner, Edda
Jensen, Lars
Jones, Owain Rhodri
Kain, Verena
Mazzoni, Stefano
Meddahi, Malika
author_facet Schmidt, Janet
Biskup, Bartolomej
Bracco, Chiara
Goddard, Brennan
Gorbonosov, Roman
Gourber-Pace, Marine
Gschwendtner, Edda
Jensen, Lars
Jones, Owain Rhodri
Kain, Verena
Mazzoni, Stefano
Meddahi, Malika
author_sort Schmidt, Janet
collection CERN
description The AWAKE experiment at CERN will use a proton bunch with an momentum of 400 GeV/c from the SPS to drive large amplitude wakefields in a plasma. This will require a ~830 m long transfer line from the SPS to the experiment. The prepa- rations for the beam commissioning of the AWAKE proton transfer line are presented in this paper. They include the detailed planning of the commissioning steps, controls and beam instrumentation specifications as well as operational tools, which are developed for the steering and monitoring of the beam line. The installation of the transfer line has been finished and first beam is planned in summer 2016.
id oai-inspirehep.net-1469907
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2016
record_format invenio
spelling oai-inspirehep.net-14699072022-08-10T12:47:52Zdoi:10.18429/JACoW-IPAC2016-TUPMR052http://cds.cern.ch/record/2207356engSchmidt, JanetBiskup, BartolomejBracco, ChiaraGoddard, BrennanGorbonosov, RomanGourber-Pace, MarineGschwendtner, EddaJensen, LarsJones, Owain RhodriKain, VerenaMazzoni, StefanoMeddahi, MalikaCommissioning Preparation of the AWAKE Proton Beam LineAccelerators and Storage RingsThe AWAKE experiment at CERN will use a proton bunch with an momentum of 400 GeV/c from the SPS to drive large amplitude wakefields in a plasma. This will require a ~830 m long transfer line from the SPS to the experiment. The prepa- rations for the beam commissioning of the AWAKE proton transfer line are presented in this paper. They include the detailed planning of the commissioning steps, controls and beam instrumentation specifications as well as operational tools, which are developed for the steering and monitoring of the beam line. The installation of the transfer line has been finished and first beam is planned in summer 2016.CERN-ACC-2016-269oai:inspirehep.net:14699072016
spellingShingle Accelerators and Storage Rings
Schmidt, Janet
Biskup, Bartolomej
Bracco, Chiara
Goddard, Brennan
Gorbonosov, Roman
Gourber-Pace, Marine
Gschwendtner, Edda
Jensen, Lars
Jones, Owain Rhodri
Kain, Verena
Mazzoni, Stefano
Meddahi, Malika
Commissioning Preparation of the AWAKE Proton Beam Line
title Commissioning Preparation of the AWAKE Proton Beam Line
title_full Commissioning Preparation of the AWAKE Proton Beam Line
title_fullStr Commissioning Preparation of the AWAKE Proton Beam Line
title_full_unstemmed Commissioning Preparation of the AWAKE Proton Beam Line
title_short Commissioning Preparation of the AWAKE Proton Beam Line
title_sort commissioning preparation of the awake proton beam line
topic Accelerators and Storage Rings
url https://dx.doi.org/10.18429/JACoW-IPAC2016-TUPMR052
http://cds.cern.ch/record/2207356
work_keys_str_mv AT schmidtjanet commissioningpreparationoftheawakeprotonbeamline
AT biskupbartolomej commissioningpreparationoftheawakeprotonbeamline
AT braccochiara commissioningpreparationoftheawakeprotonbeamline
AT goddardbrennan commissioningpreparationoftheawakeprotonbeamline
AT gorbonosovroman commissioningpreparationoftheawakeprotonbeamline
AT gourberpacemarine commissioningpreparationoftheawakeprotonbeamline
AT gschwendtneredda commissioningpreparationoftheawakeprotonbeamline
AT jensenlars commissioningpreparationoftheawakeprotonbeamline
AT jonesowainrhodri commissioningpreparationoftheawakeprotonbeamline
AT kainverena commissioningpreparationoftheawakeprotonbeamline
AT mazzonistefano commissioningpreparationoftheawakeprotonbeamline
AT meddahimalika commissioningpreparationoftheawakeprotonbeamline