Cargando…
Commissioning Preparation of the AWAKE Proton Beam Line
The AWAKE experiment at CERN will use a proton bunch with an momentum of 400 GeV/c from the SPS to drive large amplitude wakefields in a plasma. This will require a ~830 m long transfer line from the SPS to the experiment. The prepa- rations for the beam commissioning of the AWAKE proton transfer li...
Autores principales: | , , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2016
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IPAC2016-TUPMR052 http://cds.cern.ch/record/2207356 |
_version_ | 1780951682147942400 |
---|---|
author | Schmidt, Janet Biskup, Bartolomej Bracco, Chiara Goddard, Brennan Gorbonosov, Roman Gourber-Pace, Marine Gschwendtner, Edda Jensen, Lars Jones, Owain Rhodri Kain, Verena Mazzoni, Stefano Meddahi, Malika |
author_facet | Schmidt, Janet Biskup, Bartolomej Bracco, Chiara Goddard, Brennan Gorbonosov, Roman Gourber-Pace, Marine Gschwendtner, Edda Jensen, Lars Jones, Owain Rhodri Kain, Verena Mazzoni, Stefano Meddahi, Malika |
author_sort | Schmidt, Janet |
collection | CERN |
description | The AWAKE experiment at CERN will use a proton bunch with an momentum of 400 GeV/c from the SPS to drive large amplitude wakefields in a plasma. This will require a ~830 m long transfer line from the SPS to the experiment. The prepa- rations for the beam commissioning of the AWAKE proton transfer line are presented in this paper. They include the detailed planning of the commissioning steps, controls and beam instrumentation specifications as well as operational tools, which are developed for the steering and monitoring of the beam line. The installation of the transfer line has been finished and first beam is planned in summer 2016. |
id | oai-inspirehep.net-1469907 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2016 |
record_format | invenio |
spelling | oai-inspirehep.net-14699072022-08-10T12:47:52Zdoi:10.18429/JACoW-IPAC2016-TUPMR052http://cds.cern.ch/record/2207356engSchmidt, JanetBiskup, BartolomejBracco, ChiaraGoddard, BrennanGorbonosov, RomanGourber-Pace, MarineGschwendtner, EddaJensen, LarsJones, Owain RhodriKain, VerenaMazzoni, StefanoMeddahi, MalikaCommissioning Preparation of the AWAKE Proton Beam LineAccelerators and Storage RingsThe AWAKE experiment at CERN will use a proton bunch with an momentum of 400 GeV/c from the SPS to drive large amplitude wakefields in a plasma. This will require a ~830 m long transfer line from the SPS to the experiment. The prepa- rations for the beam commissioning of the AWAKE proton transfer line are presented in this paper. They include the detailed planning of the commissioning steps, controls and beam instrumentation specifications as well as operational tools, which are developed for the steering and monitoring of the beam line. The installation of the transfer line has been finished and first beam is planned in summer 2016.CERN-ACC-2016-269oai:inspirehep.net:14699072016 |
spellingShingle | Accelerators and Storage Rings Schmidt, Janet Biskup, Bartolomej Bracco, Chiara Goddard, Brennan Gorbonosov, Roman Gourber-Pace, Marine Gschwendtner, Edda Jensen, Lars Jones, Owain Rhodri Kain, Verena Mazzoni, Stefano Meddahi, Malika Commissioning Preparation of the AWAKE Proton Beam Line |
title | Commissioning Preparation of the AWAKE Proton Beam Line |
title_full | Commissioning Preparation of the AWAKE Proton Beam Line |
title_fullStr | Commissioning Preparation of the AWAKE Proton Beam Line |
title_full_unstemmed | Commissioning Preparation of the AWAKE Proton Beam Line |
title_short | Commissioning Preparation of the AWAKE Proton Beam Line |
title_sort | commissioning preparation of the awake proton beam line |
topic | Accelerators and Storage Rings |
url | https://dx.doi.org/10.18429/JACoW-IPAC2016-TUPMR052 http://cds.cern.ch/record/2207356 |
work_keys_str_mv | AT schmidtjanet commissioningpreparationoftheawakeprotonbeamline AT biskupbartolomej commissioningpreparationoftheawakeprotonbeamline AT braccochiara commissioningpreparationoftheawakeprotonbeamline AT goddardbrennan commissioningpreparationoftheawakeprotonbeamline AT gorbonosovroman commissioningpreparationoftheawakeprotonbeamline AT gourberpacemarine commissioningpreparationoftheawakeprotonbeamline AT gschwendtneredda commissioningpreparationoftheawakeprotonbeamline AT jensenlars commissioningpreparationoftheawakeprotonbeamline AT jonesowainrhodri commissioningpreparationoftheawakeprotonbeamline AT kainverena commissioningpreparationoftheawakeprotonbeamline AT mazzonistefano commissioningpreparationoftheawakeprotonbeamline AT meddahimalika commissioningpreparationoftheawakeprotonbeamline |