Cargando…

Integration, Configuration and Coordination: from Project to Reality, at CERN

The rigorous process in place at CERN to approve and follow-up the implementation of any modification of the LHC machine and its Injectors is presented in this paper. Our methodology implies the support of three teams, in charge of the configuration management, the scheduling and safety coordination...

Descripción completa

Detalles Bibliográficos
Autores principales: Barberan Marin, Maria, Bartolome-Jimenez, Sonia, Bernardini, Marzia, Birtwistle, Thomas, Chemli, Samy, Corso, Jean-Pierre, Coupard, Julie, Foraz, Katy, Grillot, Serge, Muttoni, Yvon, Perrot, Anne-Laure
Lenguaje:eng
Publicado: 2016
Materias:
Acceso en línea:https://dx.doi.org/10.18429/JACoW-IPAC2016-TUPMW003
http://cds.cern.ch/record/2207358
_version_ 1780951682615607296
author Barberan Marin, Maria
Bartolome-Jimenez, Sonia
Bernardini, Marzia
Birtwistle, Thomas
Chemli, Samy
Corso, Jean-Pierre
Coupard, Julie
Foraz, Katy
Grillot, Serge
Muttoni, Yvon
Perrot, Anne-Laure
author_facet Barberan Marin, Maria
Bartolome-Jimenez, Sonia
Bernardini, Marzia
Birtwistle, Thomas
Chemli, Samy
Corso, Jean-Pierre
Coupard, Julie
Foraz, Katy
Grillot, Serge
Muttoni, Yvon
Perrot, Anne-Laure
author_sort Barberan Marin, Maria
collection CERN
description The rigorous process in place at CERN to approve and follow-up the implementation of any modification of the LHC machine and its Injectors is presented in this paper. Our methodology implies the support of three teams, in charge of the configuration management, the scheduling and safety coordination, and the 3D integration studies. At each stage of the project the support of the three teams evolves, to provide the adequate support in the preparation phase and during the technical stops and long shutdowns. The formal roles and the processes used to govern the interaction of the Integration, Configuration and Coordination teams, and their relation to the project teams during the preparation and implementation phases, for activities to be performed in LHC and its injector chain are described and discussed.
id oai-inspirehep.net-1469917
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2016
record_format invenio
spelling oai-inspirehep.net-14699172022-08-10T12:47:52Zdoi:10.18429/JACoW-IPAC2016-TUPMW003http://cds.cern.ch/record/2207358engBarberan Marin, MariaBartolome-Jimenez, SoniaBernardini, MarziaBirtwistle, ThomasChemli, SamyCorso, Jean-PierreCoupard, JulieForaz, KatyGrillot, SergeMuttoni, YvonPerrot, Anne-LaureIntegration, Configuration and Coordination: from Project to Reality, at CERNAccelerators and Storage RingsThe rigorous process in place at CERN to approve and follow-up the implementation of any modification of the LHC machine and its Injectors is presented in this paper. Our methodology implies the support of three teams, in charge of the configuration management, the scheduling and safety coordination, and the 3D integration studies. At each stage of the project the support of the three teams evolves, to provide the adequate support in the preparation phase and during the technical stops and long shutdowns. The formal roles and the processes used to govern the interaction of the Integration, Configuration and Coordination teams, and their relation to the project teams during the preparation and implementation phases, for activities to be performed in LHC and its injector chain are described and discussed.CERN-ACC-2016-267oai:inspirehep.net:14699172016
spellingShingle Accelerators and Storage Rings
Barberan Marin, Maria
Bartolome-Jimenez, Sonia
Bernardini, Marzia
Birtwistle, Thomas
Chemli, Samy
Corso, Jean-Pierre
Coupard, Julie
Foraz, Katy
Grillot, Serge
Muttoni, Yvon
Perrot, Anne-Laure
Integration, Configuration and Coordination: from Project to Reality, at CERN
title Integration, Configuration and Coordination: from Project to Reality, at CERN
title_full Integration, Configuration and Coordination: from Project to Reality, at CERN
title_fullStr Integration, Configuration and Coordination: from Project to Reality, at CERN
title_full_unstemmed Integration, Configuration and Coordination: from Project to Reality, at CERN
title_short Integration, Configuration and Coordination: from Project to Reality, at CERN
title_sort integration, configuration and coordination: from project to reality, at cern
topic Accelerators and Storage Rings
url https://dx.doi.org/10.18429/JACoW-IPAC2016-TUPMW003
http://cds.cern.ch/record/2207358
work_keys_str_mv AT barberanmarinmaria integrationconfigurationandcoordinationfromprojecttorealityatcern
AT bartolomejimenezsonia integrationconfigurationandcoordinationfromprojecttorealityatcern
AT bernardinimarzia integrationconfigurationandcoordinationfromprojecttorealityatcern
AT birtwistlethomas integrationconfigurationandcoordinationfromprojecttorealityatcern
AT chemlisamy integrationconfigurationandcoordinationfromprojecttorealityatcern
AT corsojeanpierre integrationconfigurationandcoordinationfromprojecttorealityatcern
AT coupardjulie integrationconfigurationandcoordinationfromprojecttorealityatcern
AT forazkaty integrationconfigurationandcoordinationfromprojecttorealityatcern
AT grillotserge integrationconfigurationandcoordinationfromprojecttorealityatcern
AT muttoniyvon integrationconfigurationandcoordinationfromprojecttorealityatcern
AT perrotannelaure integrationconfigurationandcoordinationfromprojecttorealityatcern