Cargando…
Beam Commissioning of the HIE-ISOLDE Post-Accelerator
Phase 1a of the High Intensity and Energy ISOLDE (HIE-ISOLDE) project* was completed in 2015. The first cryomodule and two High Energy Beam Transfer lines (HEBT) were installed. In addition, many of the subsystems of the normal conducting part of the post-accelerator (REX) were renovated or refurbis...
Autores principales: | , , , , , , , , , , , , , , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2016
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IPAC2016-WEOBA01 http://cds.cern.ch/record/2207395 |
_version_ | 1780951691361779712 |
---|---|
author | Rodriguez, Jose Andreazza, William Bibby, James Bidault, Niels Bravin, Enrico Broere, Johannes Cantero, Esteban Catherall, Richard Cobham, Vince Elias, Michal Fadakis, Eleftherios Fernier, Pascal Fraser, Matthew Gerigk, Frank Hanke, Klaus Kadi, Yacine Lozano Benito, Miguel Matli, Emanuele Sadovich, Sergey Siesling, Erwin Valuch, Daniel Venturini Delsolaro, Walter Wenander, Fredrik Zhang, Pei |
author_facet | Rodriguez, Jose Andreazza, William Bibby, James Bidault, Niels Bravin, Enrico Broere, Johannes Cantero, Esteban Catherall, Richard Cobham, Vince Elias, Michal Fadakis, Eleftherios Fernier, Pascal Fraser, Matthew Gerigk, Frank Hanke, Klaus Kadi, Yacine Lozano Benito, Miguel Matli, Emanuele Sadovich, Sergey Siesling, Erwin Valuch, Daniel Venturini Delsolaro, Walter Wenander, Fredrik Zhang, Pei |
author_sort | Rodriguez, Jose |
collection | CERN |
description | Phase 1a of the High Intensity and Energy ISOLDE (HIE-ISOLDE) project* was completed in 2015. The first cryomodule and two High Energy Beam Transfer lines (HEBT) were installed. In addition, many of the subsystems of the normal conducting part of the post-accelerator (REX) were renovated or refurbished. Following the hardware commissioning of the different system** and, in preparation for the start of the physics program, many tests and measurements were conducted as part of the beam commissioning program. The results of these tests and the plan for the next beam commissioning campaign are discussed in this paper. |
id | oai-inspirehep.net-1470106 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2016 |
record_format | invenio |
spelling | oai-inspirehep.net-14701062022-08-10T12:44:33Zdoi:10.18429/JACoW-IPAC2016-WEOBA01http://cds.cern.ch/record/2207395engRodriguez, JoseAndreazza, WilliamBibby, JamesBidault, NielsBravin, EnricoBroere, JohannesCantero, EstebanCatherall, RichardCobham, VinceElias, MichalFadakis, EleftheriosFernier, PascalFraser, MatthewGerigk, FrankHanke, KlausKadi, YacineLozano Benito, MiguelMatli, EmanueleSadovich, SergeySiesling, ErwinValuch, DanielVenturini Delsolaro, WalterWenander, FredrikZhang, PeiBeam Commissioning of the HIE-ISOLDE Post-AcceleratorAccelerators and Storage RingsPhase 1a of the High Intensity and Energy ISOLDE (HIE-ISOLDE) project* was completed in 2015. The first cryomodule and two High Energy Beam Transfer lines (HEBT) were installed. In addition, many of the subsystems of the normal conducting part of the post-accelerator (REX) were renovated or refurbished. Following the hardware commissioning of the different system** and, in preparation for the start of the physics program, many tests and measurements were conducted as part of the beam commissioning program. The results of these tests and the plan for the next beam commissioning campaign are discussed in this paper.CERN-ACC-2016-230oai:inspirehep.net:14701062016 |
spellingShingle | Accelerators and Storage Rings Rodriguez, Jose Andreazza, William Bibby, James Bidault, Niels Bravin, Enrico Broere, Johannes Cantero, Esteban Catherall, Richard Cobham, Vince Elias, Michal Fadakis, Eleftherios Fernier, Pascal Fraser, Matthew Gerigk, Frank Hanke, Klaus Kadi, Yacine Lozano Benito, Miguel Matli, Emanuele Sadovich, Sergey Siesling, Erwin Valuch, Daniel Venturini Delsolaro, Walter Wenander, Fredrik Zhang, Pei Beam Commissioning of the HIE-ISOLDE Post-Accelerator |
title | Beam Commissioning of the HIE-ISOLDE Post-Accelerator |
title_full | Beam Commissioning of the HIE-ISOLDE Post-Accelerator |
title_fullStr | Beam Commissioning of the HIE-ISOLDE Post-Accelerator |
title_full_unstemmed | Beam Commissioning of the HIE-ISOLDE Post-Accelerator |
title_short | Beam Commissioning of the HIE-ISOLDE Post-Accelerator |
title_sort | beam commissioning of the hie-isolde post-accelerator |
topic | Accelerators and Storage Rings |
url | https://dx.doi.org/10.18429/JACoW-IPAC2016-WEOBA01 http://cds.cern.ch/record/2207395 |
work_keys_str_mv | AT rodriguezjose beamcommissioningofthehieisoldepostaccelerator AT andreazzawilliam beamcommissioningofthehieisoldepostaccelerator AT bibbyjames beamcommissioningofthehieisoldepostaccelerator AT bidaultniels beamcommissioningofthehieisoldepostaccelerator AT bravinenrico beamcommissioningofthehieisoldepostaccelerator AT broerejohannes beamcommissioningofthehieisoldepostaccelerator AT canteroesteban beamcommissioningofthehieisoldepostaccelerator AT catherallrichard beamcommissioningofthehieisoldepostaccelerator AT cobhamvince beamcommissioningofthehieisoldepostaccelerator AT eliasmichal beamcommissioningofthehieisoldepostaccelerator AT fadakiseleftherios beamcommissioningofthehieisoldepostaccelerator AT fernierpascal beamcommissioningofthehieisoldepostaccelerator AT frasermatthew beamcommissioningofthehieisoldepostaccelerator AT gerigkfrank beamcommissioningofthehieisoldepostaccelerator AT hankeklaus beamcommissioningofthehieisoldepostaccelerator AT kadiyacine beamcommissioningofthehieisoldepostaccelerator AT lozanobenitomiguel beamcommissioningofthehieisoldepostaccelerator AT matliemanuele beamcommissioningofthehieisoldepostaccelerator AT sadovichsergey beamcommissioningofthehieisoldepostaccelerator AT sieslingerwin beamcommissioningofthehieisoldepostaccelerator AT valuchdaniel beamcommissioningofthehieisoldepostaccelerator AT venturinidelsolarowalter beamcommissioningofthehieisoldepostaccelerator AT wenanderfredrik beamcommissioningofthehieisoldepostaccelerator AT zhangpei beamcommissioningofthehieisoldepostaccelerator |