Cargando…

HIE-ISOLDE: First Commissioning Experience

The HIE ISOLDE project [1] reached a major milestone in October 2015, with the start of the first physics run with radioactive ion beams. This achievement was the culminating point of intense months during which the first cryomodule of the HIE ISOLDE superconducting Linac and its high-energy beam tr...

Descripción completa

Detalles Bibliográficos
Autores principales: Venturini Delsolaro, Walter, Bravin, Enrico, Delruelle, Nicolas, Elias, Michal, Ferreira Somoza, Jose, Fraser, Matthew, Gayde, Jean-Christophe, Kadi, Yacine, Kautzmann, Guillaume, Klumb, Francis, Leclercq, Yann, Martino, Michele, Parma, Vittorio, Rodriguez, Jose, Sadovich, Sergey, Siesling, Erwin, Smekens, David, Valdarno, Luca, Valuch, Daniel, Zhang, Pei
Lenguaje:eng
Publicado: 2016
Materias:
Acceso en línea:https://dx.doi.org/10.18429/JACoW-IPAC2016-WEPMB051
http://cds.cern.ch/record/2207398
_version_ 1780951692032868352
author Venturini Delsolaro, Walter
Bravin, Enrico
Delruelle, Nicolas
Elias, Michal
Ferreira Somoza, Jose
Fraser, Matthew
Gayde, Jean-Christophe
Kadi, Yacine
Kautzmann, Guillaume
Klumb, Francis
Leclercq, Yann
Martino, Michele
Parma, Vittorio
Rodriguez, Jose
Sadovich, Sergey
Siesling, Erwin
Smekens, David
Valdarno, Luca
Valuch, Daniel
Zhang, Pei
author_facet Venturini Delsolaro, Walter
Bravin, Enrico
Delruelle, Nicolas
Elias, Michal
Ferreira Somoza, Jose
Fraser, Matthew
Gayde, Jean-Christophe
Kadi, Yacine
Kautzmann, Guillaume
Klumb, Francis
Leclercq, Yann
Martino, Michele
Parma, Vittorio
Rodriguez, Jose
Sadovich, Sergey
Siesling, Erwin
Smekens, David
Valdarno, Luca
Valuch, Daniel
Zhang, Pei
author_sort Venturini Delsolaro, Walter
collection CERN
description The HIE ISOLDE project [1] reached a major milestone in October 2015, with the start of the first physics run with radioactive ion beams. This achievement was the culminating point of intense months during which the first cryomodule of the HIE ISOLDE superconducting Linac and its high-energy beam transfer lines were first installed and subsequently brought into operation. Hardware commissioning campaigns were conducted in order to define the envelope of parameters within which the machine could be operated, to test and validate software and controls, and to investigate the limitations preventing the systems to reach their design performance. Methods and main results of the first commissioning of HIE ISOLDE post accelerator, including the performance of the superconducting cavities with beam, will be reviewed in this contribution.
id oai-inspirehep.net-1470160
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2016
record_format invenio
spelling oai-inspirehep.net-14701602022-08-10T12:51:54Zdoi:10.18429/JACoW-IPAC2016-WEPMB051http://cds.cern.ch/record/2207398engVenturini Delsolaro, WalterBravin, EnricoDelruelle, NicolasElias, MichalFerreira Somoza, JoseFraser, MatthewGayde, Jean-ChristopheKadi, YacineKautzmann, GuillaumeKlumb, FrancisLeclercq, YannMartino, MicheleParma, VittorioRodriguez, JoseSadovich, SergeySiesling, ErwinSmekens, DavidValdarno, LucaValuch, DanielZhang, PeiHIE-ISOLDE: First Commissioning ExperienceAccelerators and Storage RingsThe HIE ISOLDE project [1] reached a major milestone in October 2015, with the start of the first physics run with radioactive ion beams. This achievement was the culminating point of intense months during which the first cryomodule of the HIE ISOLDE superconducting Linac and its high-energy beam transfer lines were first installed and subsequently brought into operation. Hardware commissioning campaigns were conducted in order to define the envelope of parameters within which the machine could be operated, to test and validate software and controls, and to investigate the limitations preventing the systems to reach their design performance. Methods and main results of the first commissioning of HIE ISOLDE post accelerator, including the performance of the superconducting cavities with beam, will be reviewed in this contribution.CERN-ACC-2016-227oai:inspirehep.net:14701602016
spellingShingle Accelerators and Storage Rings
Venturini Delsolaro, Walter
Bravin, Enrico
Delruelle, Nicolas
Elias, Michal
Ferreira Somoza, Jose
Fraser, Matthew
Gayde, Jean-Christophe
Kadi, Yacine
Kautzmann, Guillaume
Klumb, Francis
Leclercq, Yann
Martino, Michele
Parma, Vittorio
Rodriguez, Jose
Sadovich, Sergey
Siesling, Erwin
Smekens, David
Valdarno, Luca
Valuch, Daniel
Zhang, Pei
HIE-ISOLDE: First Commissioning Experience
title HIE-ISOLDE: First Commissioning Experience
title_full HIE-ISOLDE: First Commissioning Experience
title_fullStr HIE-ISOLDE: First Commissioning Experience
title_full_unstemmed HIE-ISOLDE: First Commissioning Experience
title_short HIE-ISOLDE: First Commissioning Experience
title_sort hie-isolde: first commissioning experience
topic Accelerators and Storage Rings
url https://dx.doi.org/10.18429/JACoW-IPAC2016-WEPMB051
http://cds.cern.ch/record/2207398
work_keys_str_mv AT venturinidelsolarowalter hieisoldefirstcommissioningexperience
AT bravinenrico hieisoldefirstcommissioningexperience
AT delruellenicolas hieisoldefirstcommissioningexperience
AT eliasmichal hieisoldefirstcommissioningexperience
AT ferreirasomozajose hieisoldefirstcommissioningexperience
AT frasermatthew hieisoldefirstcommissioningexperience
AT gaydejeanchristophe hieisoldefirstcommissioningexperience
AT kadiyacine hieisoldefirstcommissioningexperience
AT kautzmannguillaume hieisoldefirstcommissioningexperience
AT klumbfrancis hieisoldefirstcommissioningexperience
AT leclercqyann hieisoldefirstcommissioningexperience
AT martinomichele hieisoldefirstcommissioningexperience
AT parmavittorio hieisoldefirstcommissioningexperience
AT rodriguezjose hieisoldefirstcommissioningexperience
AT sadovichsergey hieisoldefirstcommissioningexperience
AT sieslingerwin hieisoldefirstcommissioningexperience
AT smekensdavid hieisoldefirstcommissioningexperience
AT valdarnoluca hieisoldefirstcommissioningexperience
AT valuchdaniel hieisoldefirstcommissioningexperience
AT zhangpei hieisoldefirstcommissioningexperience