Cargando…
HIE-ISOLDE: First Commissioning Experience
The HIE ISOLDE project [1] reached a major milestone in October 2015, with the start of the first physics run with radioactive ion beams. This achievement was the culminating point of intense months during which the first cryomodule of the HIE ISOLDE superconducting Linac and its high-energy beam tr...
Autores principales: | , , , , , , , , , , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2016
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IPAC2016-WEPMB051 http://cds.cern.ch/record/2207398 |
_version_ | 1780951692032868352 |
---|---|
author | Venturini Delsolaro, Walter Bravin, Enrico Delruelle, Nicolas Elias, Michal Ferreira Somoza, Jose Fraser, Matthew Gayde, Jean-Christophe Kadi, Yacine Kautzmann, Guillaume Klumb, Francis Leclercq, Yann Martino, Michele Parma, Vittorio Rodriguez, Jose Sadovich, Sergey Siesling, Erwin Smekens, David Valdarno, Luca Valuch, Daniel Zhang, Pei |
author_facet | Venturini Delsolaro, Walter Bravin, Enrico Delruelle, Nicolas Elias, Michal Ferreira Somoza, Jose Fraser, Matthew Gayde, Jean-Christophe Kadi, Yacine Kautzmann, Guillaume Klumb, Francis Leclercq, Yann Martino, Michele Parma, Vittorio Rodriguez, Jose Sadovich, Sergey Siesling, Erwin Smekens, David Valdarno, Luca Valuch, Daniel Zhang, Pei |
author_sort | Venturini Delsolaro, Walter |
collection | CERN |
description | The HIE ISOLDE project [1] reached a major milestone in October 2015, with the start of the first physics run with radioactive ion beams. This achievement was the culminating point of intense months during which the first cryomodule of the HIE ISOLDE superconducting Linac and its high-energy beam transfer lines were first installed and subsequently brought into operation. Hardware commissioning campaigns were conducted in order to define the envelope of parameters within which the machine could be operated, to test and validate software and controls, and to investigate the limitations preventing the systems to reach their design performance. Methods and main results of the first commissioning of HIE ISOLDE post accelerator, including the performance of the superconducting cavities with beam, will be reviewed in this contribution. |
id | oai-inspirehep.net-1470160 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2016 |
record_format | invenio |
spelling | oai-inspirehep.net-14701602022-08-10T12:51:54Zdoi:10.18429/JACoW-IPAC2016-WEPMB051http://cds.cern.ch/record/2207398engVenturini Delsolaro, WalterBravin, EnricoDelruelle, NicolasElias, MichalFerreira Somoza, JoseFraser, MatthewGayde, Jean-ChristopheKadi, YacineKautzmann, GuillaumeKlumb, FrancisLeclercq, YannMartino, MicheleParma, VittorioRodriguez, JoseSadovich, SergeySiesling, ErwinSmekens, DavidValdarno, LucaValuch, DanielZhang, PeiHIE-ISOLDE: First Commissioning ExperienceAccelerators and Storage RingsThe HIE ISOLDE project [1] reached a major milestone in October 2015, with the start of the first physics run with radioactive ion beams. This achievement was the culminating point of intense months during which the first cryomodule of the HIE ISOLDE superconducting Linac and its high-energy beam transfer lines were first installed and subsequently brought into operation. Hardware commissioning campaigns were conducted in order to define the envelope of parameters within which the machine could be operated, to test and validate software and controls, and to investigate the limitations preventing the systems to reach their design performance. Methods and main results of the first commissioning of HIE ISOLDE post accelerator, including the performance of the superconducting cavities with beam, will be reviewed in this contribution.CERN-ACC-2016-227oai:inspirehep.net:14701602016 |
spellingShingle | Accelerators and Storage Rings Venturini Delsolaro, Walter Bravin, Enrico Delruelle, Nicolas Elias, Michal Ferreira Somoza, Jose Fraser, Matthew Gayde, Jean-Christophe Kadi, Yacine Kautzmann, Guillaume Klumb, Francis Leclercq, Yann Martino, Michele Parma, Vittorio Rodriguez, Jose Sadovich, Sergey Siesling, Erwin Smekens, David Valdarno, Luca Valuch, Daniel Zhang, Pei HIE-ISOLDE: First Commissioning Experience |
title | HIE-ISOLDE: First Commissioning Experience |
title_full | HIE-ISOLDE: First Commissioning Experience |
title_fullStr | HIE-ISOLDE: First Commissioning Experience |
title_full_unstemmed | HIE-ISOLDE: First Commissioning Experience |
title_short | HIE-ISOLDE: First Commissioning Experience |
title_sort | hie-isolde: first commissioning experience |
topic | Accelerators and Storage Rings |
url | https://dx.doi.org/10.18429/JACoW-IPAC2016-WEPMB051 http://cds.cern.ch/record/2207398 |
work_keys_str_mv | AT venturinidelsolarowalter hieisoldefirstcommissioningexperience AT bravinenrico hieisoldefirstcommissioningexperience AT delruellenicolas hieisoldefirstcommissioningexperience AT eliasmichal hieisoldefirstcommissioningexperience AT ferreirasomozajose hieisoldefirstcommissioningexperience AT frasermatthew hieisoldefirstcommissioningexperience AT gaydejeanchristophe hieisoldefirstcommissioningexperience AT kadiyacine hieisoldefirstcommissioningexperience AT kautzmannguillaume hieisoldefirstcommissioningexperience AT klumbfrancis hieisoldefirstcommissioningexperience AT leclercqyann hieisoldefirstcommissioningexperience AT martinomichele hieisoldefirstcommissioningexperience AT parmavittorio hieisoldefirstcommissioningexperience AT rodriguezjose hieisoldefirstcommissioningexperience AT sadovichsergey hieisoldefirstcommissioningexperience AT sieslingerwin hieisoldefirstcommissioningexperience AT smekensdavid hieisoldefirstcommissioningexperience AT valdarnoluca hieisoldefirstcommissioningexperience AT valuchdaniel hieisoldefirstcommissioningexperience AT zhangpei hieisoldefirstcommissioningexperience |