Cargando…
HIE-ISOLDE: First Commissioning Experience
The HIE ISOLDE project [1] reached a major milestone in October 2015, with the start of the first physics run with radioactive ion beams. This achievement was the culminating point of intense months during which the first cryomodule of the HIE ISOLDE superconducting Linac and its high-energy beam tr...
Autores principales: | Venturini Delsolaro, Walter, Bravin, Enrico, Delruelle, Nicolas, Elias, Michal, Ferreira Somoza, Jose, Fraser, Matthew, Gayde, Jean-Christophe, Kadi, Yacine, Kautzmann, Guillaume, Klumb, Francis, Leclercq, Yann, Martino, Michele, Parma, Vittorio, Rodriguez, Jose, Sadovich, Sergey, Siesling, Erwin, Smekens, David, Valdarno, Luca, Valuch, Daniel, Zhang, Pei |
---|---|
Lenguaje: | eng |
Publicado: |
2016
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IPAC2016-WEPMB051 http://cds.cern.ch/record/2207398 |
Ejemplares similares
-
HIE-ISOLDE SC Linac progress and commissioning in 2016
por: Venturini Delsolaro, Walter, et al.
Publicado: (2017) -
Progress on the HIE-ISOLDE Facility
por: Kadi, Yacine, et al.
Publicado: (2016) -
Status of the SRF systems at HIE-ISOLDE
por: Venturini Delsolaro, Walter, et al.
Publicado: (2015) -
Beam Commissioning of the HIE-ISOLDE Post-Accelerator
por: Rodriguez, Jose, et al.
Publicado: (2016) -
Status of the HIE-ISOLDE Linac
por: Venturini Delsolaro, Walter, et al.
Publicado: (2014)