Cargando…
Status and Plans for Completion of the Experimental Programme of the Clic Test Facility Ctf3
The CLIC Test Facility CTF3 was build, commissioned and operated at CERN by an international collaboration, with the aim of validating the CLIC two beam acceleration scheme, in which the RF power used to accelerate e⁺/e⁻ beams is extracted from a high intensity electron beam. In the past years the m...
Autores principales: | , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2016
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IPAC2016-THPMB046 http://cds.cern.ch/record/2207440 |
Sumario: | The CLIC Test Facility CTF3 was build, commissioned and operated at CERN by an international collaboration, with the aim of validating the CLIC two beam acceleration scheme, in which the RF power used to accelerate e⁺/e⁻ beams is extracted from a high intensity electron beam. In the past years the main issues of such a scheme were assessed, demonstrating its feasibility. The CTF3 experimental programme is complementing these results by addressing cost and performance subjects, mainly using the CALIFES test beam injector and a full scale two-beam module. In this paper we document the present status and give an outlook to next year run, when the experimental programme should be completed. |
---|