Cargando…
Status and Plans for Completion of the Experimental Programme of the Clic Test Facility Ctf3
The CLIC Test Facility CTF3 was build, commissioned and operated at CERN by an international collaboration, with the aim of validating the CLIC two beam acceleration scheme, in which the RF power used to accelerate e⁺/e⁻ beams is extracted from a high intensity electron beam. In the past years the m...
Autores principales: | , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2016
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IPAC2016-THPMB046 http://cds.cern.ch/record/2207440 |
_version_ | 1780951701845442560 |
---|---|
author | Skowroński, Piotr Corsini, Roberto Döbert, Steffen Farabolini, Wilfrid Gamba, Davide Malina, Lukas Persson, Tobias Tecker, Frank |
author_facet | Skowroński, Piotr Corsini, Roberto Döbert, Steffen Farabolini, Wilfrid Gamba, Davide Malina, Lukas Persson, Tobias Tecker, Frank |
author_sort | Skowroński, Piotr |
collection | CERN |
description | The CLIC Test Facility CTF3 was build, commissioned and operated at CERN by an international collaboration, with the aim of validating the CLIC two beam acceleration scheme, in which the RF power used to accelerate e⁺/e⁻ beams is extracted from a high intensity electron beam. In the past years the main issues of such a scheme were assessed, demonstrating its feasibility. The CTF3 experimental programme is complementing these results by addressing cost and performance subjects, mainly using the CALIFES test beam injector and a full scale two-beam module. In this paper we document the present status and give an outlook to next year run, when the experimental programme should be completed. |
id | oai-inspirehep.net-1470489 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2016 |
record_format | invenio |
spelling | oai-inspirehep.net-14704892023-07-20T15:06:42Zdoi:10.18429/JACoW-IPAC2016-THPMB046http://cds.cern.ch/record/2207440engSkowroński, PiotrCorsini, RobertoDöbert, SteffenFarabolini, WilfridGamba, DavideMalina, LukasPersson, TobiasTecker, FrankStatus and Plans for Completion of the Experimental Programme of the Clic Test Facility Ctf3Accelerators and Storage RingsThe CLIC Test Facility CTF3 was build, commissioned and operated at CERN by an international collaboration, with the aim of validating the CLIC two beam acceleration scheme, in which the RF power used to accelerate e⁺/e⁻ beams is extracted from a high intensity electron beam. In the past years the main issues of such a scheme were assessed, demonstrating its feasibility. The CTF3 experimental programme is complementing these results by addressing cost and performance subjects, mainly using the CALIFES test beam injector and a full scale two-beam module. In this paper we document the present status and give an outlook to next year run, when the experimental programme should be completed.CERN-ACC-2016-183CLIC-Note-1097oai:inspirehep.net:14704892016 |
spellingShingle | Accelerators and Storage Rings Skowroński, Piotr Corsini, Roberto Döbert, Steffen Farabolini, Wilfrid Gamba, Davide Malina, Lukas Persson, Tobias Tecker, Frank Status and Plans for Completion of the Experimental Programme of the Clic Test Facility Ctf3 |
title | Status and Plans for Completion of the Experimental Programme of the Clic Test Facility Ctf3 |
title_full | Status and Plans for Completion of the Experimental Programme of the Clic Test Facility Ctf3 |
title_fullStr | Status and Plans for Completion of the Experimental Programme of the Clic Test Facility Ctf3 |
title_full_unstemmed | Status and Plans for Completion of the Experimental Programme of the Clic Test Facility Ctf3 |
title_short | Status and Plans for Completion of the Experimental Programme of the Clic Test Facility Ctf3 |
title_sort | status and plans for completion of the experimental programme of the clic test facility ctf3 |
topic | Accelerators and Storage Rings |
url | https://dx.doi.org/10.18429/JACoW-IPAC2016-THPMB046 http://cds.cern.ch/record/2207440 |
work_keys_str_mv | AT skowronskipiotr statusandplansforcompletionoftheexperimentalprogrammeoftheclictestfacilityctf3 AT corsiniroberto statusandplansforcompletionoftheexperimentalprogrammeoftheclictestfacilityctf3 AT dobertsteffen statusandplansforcompletionoftheexperimentalprogrammeoftheclictestfacilityctf3 AT faraboliniwilfrid statusandplansforcompletionoftheexperimentalprogrammeoftheclictestfacilityctf3 AT gambadavide statusandplansforcompletionoftheexperimentalprogrammeoftheclictestfacilityctf3 AT malinalukas statusandplansforcompletionoftheexperimentalprogrammeoftheclictestfacilityctf3 AT perssontobias statusandplansforcompletionoftheexperimentalprogrammeoftheclictestfacilityctf3 AT teckerfrank statusandplansforcompletionoftheexperimentalprogrammeoftheclictestfacilityctf3 |