Status and Plans for Completion of the Experimental Programme of the Clic Test Facility Ctf3
The CLIC Test Facility CTF3 was build, commissioned and operated at CERN by an international collaboration, with the aim of validating the CLIC two beam acceleration scheme, in which the RF power used to accelerate e⁺/e⁻ beams is extracted from a high intensity electron beam. In the past years the m...
Autores principales: | Skowroński, Piotr, Corsini, Roberto, Döbert, Steffen, Farabolini, Wilfrid, Gamba, Davide, Malina, Lukas, Persson, Tobias, Tecker, Frank |
---|---|
Lenguaje: | eng |
Publicado: |
2016
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IPAC2016-THPMB046 http://cds.cern.ch/record/2207440 |
Ejemplares similares
-
Beam Tests at the CLIC Test Facility, CTF3
por: Corsini, Roberto, et al.
Publicado: (2014) -
Review of the Drive Beam Stabilization in the CLIC Test Facility CTF3
por: Dubrovskiy, A, et al.
Publicado: (2013) -
Transverse Beam Phase-Space Measurement Experience at CTF3
por: Gamba, Davide, et al.
Publicado: (2017) -
Recent Improvements in Drive Beam Stability in CTF3
por: Malina, Lukas, et al.
Publicado: (2016) -
Effect and Optimisation of Non-Linear Chromatic Aberrations of the CLIC Drive Beam Recombination at CTF3
por: Gamba, Davide, et al.
Publicado: (2016)