Cargando…
Feasibility Study of the Fast SPS Ion Injection Kicker System
As part of the upgrade project for ions the rise time of the injection kicker system into the SPS needs to be improved. The changes being studied include the addition of a fast Pulse Forming Line parallel to the existing Pulse Forming Network for the fast kicker magnets MKP-S. With the PFL an improv...
Autores principales: | , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2016
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IPAC2016-THPMW029 http://cds.cern.ch/record/2207458 |
_version_ | 1780951705703153664 |
---|---|
author | Ferrero Colomo, Alvaro Burkel, Peter Comte, Denis Ducimetière, Laurent Kramer, Thomas Senaj, Viliam Sermeus, Luc Velotti, Francesco |
author_facet | Ferrero Colomo, Alvaro Burkel, Peter Comte, Denis Ducimetière, Laurent Kramer, Thomas Senaj, Viliam Sermeus, Luc Velotti, Francesco |
author_sort | Ferrero Colomo, Alvaro |
collection | CERN |
description | As part of the upgrade project for ions the rise time of the injection kicker system into the SPS needs to be improved. The changes being studied include the addition of a fast Pulse Forming Line parallel to the existing Pulse Forming Network for the fast kicker magnets MKP-S. With the PFL an improved magnetic field rise time of 100 ns is targeted. Two different configuration utilizing a 2nd thyratron or two fast diode stacks have been outlined in the past. This paper presents the recent progress on the analogue circuit simulations for both options as well as measurements carried out on a test system. Modelling, optimization and simulation of the entire system with diodes and a second configuration with two thyratron switches are outlined. Measurement results are given and the feasibility of the upgrade is discussed. |
id | oai-inspirehep.net-1470571 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2016 |
record_format | invenio |
spelling | oai-inspirehep.net-14705712022-08-10T12:48:20Zdoi:10.18429/JACoW-IPAC2016-THPMW029http://cds.cern.ch/record/2207458engFerrero Colomo, AlvaroBurkel, PeterComte, DenisDucimetière, LaurentKramer, ThomasSenaj, ViliamSermeus, LucVelotti, FrancescoFeasibility Study of the Fast SPS Ion Injection Kicker SystemAccelerators and Storage RingsAs part of the upgrade project for ions the rise time of the injection kicker system into the SPS needs to be improved. The changes being studied include the addition of a fast Pulse Forming Line parallel to the existing Pulse Forming Network for the fast kicker magnets MKP-S. With the PFL an improved magnetic field rise time of 100 ns is targeted. Two different configuration utilizing a 2nd thyratron or two fast diode stacks have been outlined in the past. This paper presents the recent progress on the analogue circuit simulations for both options as well as measurements carried out on a test system. Modelling, optimization and simulation of the entire system with diodes and a second configuration with two thyratron switches are outlined. Measurement results are given and the feasibility of the upgrade is discussed.CERN-ACC-2016-165oai:inspirehep.net:14705712016 |
spellingShingle | Accelerators and Storage Rings Ferrero Colomo, Alvaro Burkel, Peter Comte, Denis Ducimetière, Laurent Kramer, Thomas Senaj, Viliam Sermeus, Luc Velotti, Francesco Feasibility Study of the Fast SPS Ion Injection Kicker System |
title | Feasibility Study of the Fast SPS Ion Injection Kicker System |
title_full | Feasibility Study of the Fast SPS Ion Injection Kicker System |
title_fullStr | Feasibility Study of the Fast SPS Ion Injection Kicker System |
title_full_unstemmed | Feasibility Study of the Fast SPS Ion Injection Kicker System |
title_short | Feasibility Study of the Fast SPS Ion Injection Kicker System |
title_sort | feasibility study of the fast sps ion injection kicker system |
topic | Accelerators and Storage Rings |
url | https://dx.doi.org/10.18429/JACoW-IPAC2016-THPMW029 http://cds.cern.ch/record/2207458 |
work_keys_str_mv | AT ferrerocolomoalvaro feasibilitystudyofthefastspsioninjectionkickersystem AT burkelpeter feasibilitystudyofthefastspsioninjectionkickersystem AT comtedenis feasibilitystudyofthefastspsioninjectionkickersystem AT ducimetierelaurent feasibilitystudyofthefastspsioninjectionkickersystem AT kramerthomas feasibilitystudyofthefastspsioninjectionkickersystem AT senajviliam feasibilitystudyofthefastspsioninjectionkickersystem AT sermeusluc feasibilitystudyofthefastspsioninjectionkickersystem AT velottifrancesco feasibilitystudyofthefastspsioninjectionkickersystem |