LHC Beam Vacuum Evolution During 2015 Machine Operation
The LHC successfully returned to operation in April, 2015 after almost 2 years of Long Shutdown 1 (LS1) for various upgrade and consolidation programs. During 2015 operation, the LHC operated for more than 1000 fills. The 2015 LHC proton physics ended with 2244 bunches per beam circulating with 25 n...
Autores principales: | Yin Vallgren, Christina, Bregliozzi, Giuseppe, Chiggiato, Paolo |
---|---|
Lenguaje: | eng |
Publicado: |
2016
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IPAC2016-THPMY010 http://cds.cern.ch/record/2207469 |
Ejemplares similares
-
LHC Beam Vacuum During 2011 Machine Operation
por: Lanza, G, et al.
Publicado: (2012) -
Present Quality Assurance for the LHC Beam Vacuum System and its Future Improvement
por: Sestak, Josef, et al.
Publicado: (2015) -
Mechanical and Vacuum Stability Studies for the LHC Experiments Upgrade
por: Sestak, Josef, et al.
Publicado: (2016) -
CERN Vacuum-System Activities during the Long Shutdown 1: The LHC Beam Vacuum
por: Baglin, V, et al.
Publicado: (2014) -
Upgrade of the CMS Experimental Beam Vacuum During LS2
por: Sestak, Josef, et al.
Publicado: (2018)